Our AI platform powers the best government contractors to win more.
Be the first to know, bid, and win.
The Regional Contracting Office Hawaii (RCO—HI) has a requirement for Preventive Maintenance and Repair of Oil Water Separator (OWS), Interceptors and Sediment Catchment Basin Systems (Basins, Grit Boxes, Trenches, and Zipper Trenches). The contractor shall provide all the resources necessa
Full Name | Phone | Type | |
---|---|---|---|
Travis Tonini | [email protected] | primary | |
Melena D. Faxon | [email protected] | secondary |