SAM.GOVDue: May 15, 2025 at 04:00 PM UTCIn-ActiveSolicitationSBASource Url
Summary
The opportunity involves the construction of a 10MW generation plant with microgrid controls at Fort Stewart, Georgia, under project number 95170. This project aims to establish a power station that utilizes natural gas generators and advanced microgrid technology to efficiently manage and distribute electricity to critical infrastructure. Contractors with experience in power generation, microgrid systems, and related construction projects are encouraged to bid, particularly those classified as small businesses, as this solicitation is set aside for total small business participation. The work will require adherence to specific engineering and construction standards, as outlined in the provided specifications and drawings.