Project 573A4-21-700 EHRM Infrastructure Upgrades construction project at the Lake City, FL VAMC
SAM.GOV
Due: June 3, 2025 at 06:00 PM UTC
In-Active Solicitation SDVOSBC Source Url

Summary

The Project 573A4-21-700 EHRM Infrastructure Upgrades construction project at the Lake City, FL VAMC involves significant enhancements to the electronic health record management infrastructure at the facility. This project is a competitive Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside, indicating a preference for contractors who meet this designation. The scope of work includes providing all necessary tools, equipment, materials, labor, and supervision to complete the upgrades as per the provided specifications and drawings. Contractors with experience in large-scale construction projects, particularly in healthcare settings, and those familiar with VA requirements and standards are encouraged to bid on this opportunity. The estimated magnitude of construction is between $20 million and $50 million, making it a substantial project for qualified bidders.
Description

In accordance with 38 U.S.C. § 8127 (Public Law 109-461), this project is a competitive Service-Disabled Veteran – Owned Small Business (SDVOSB) Set-Aside.            

The contractor shall provide all tools, equipment, materials, labor, superv

Entities
VADO
Department of Veterans Affairs
NAICS
236220
Set Aside
SDVOSBC : Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Place of Performance
Florida 32025
Point of Contact
Full Name Email Phone Type
Jason Philip [email protected] 2164478300 primary
Bridget May [email protected] secondary
Attachments
  • Attachment+15+-+Construction+Wage+Rates+-+Columbia.pdf
  • Attachment+8+-+Final+Drawing+Set+-+7a+of+8.pdf
  • Attachment+4+-+Final+Drawing+Set+-+3+of+8.pdf
  • Attachment+14+-+PreConstruction+Risk+Assessment+-+Lake+City.docx
  • Attachment+5+-+Final+Drawing+Set+-+4+of+8.pdf
  • Attachment+9+-+Final+Drawing+Set+-+7b+of+8.pdf
  • Attachment+10+-+Final+Drawing+Set+-+7c+of+8.pdf
  • Attachment+7+-+Final+Drawing+Set+-+6+of+8.pdf
  • Attachment+6+-+Final+Drawing+Set+-+5+of+8.pdf
  • Attachment+12+-+Final+Drawing+Set+-+8+of+8.pdf
  • Attachment+1+-+Final+Specs+Set+-+R4.pdf
  • Attachment+13+-+Asbestos+and+Lead+Paint+Survey+Report.pdf
  • Attachment+11+-+Final+Drawing+Set+-+7d+of+8.pdf
  • Attachment+17+-+Site+Visit+Instructions.pdf
  • Attachment+3+-+Final+Drawing+Set+-+2+of+8.pdf
  • Attachment+16+-+Limitations+on+Subcontracting+-+Construction.docx
  • Attachment+2+-+Final+Drawing+Set+-+1+of+8.pdf
  • IFB+36C77625B0006.pdf
  • Attachment+18+-+RFI+TRACKING+SHEET+-+SOLICITATION+36C77625B0006+-+Project+573A4-21-700.xlsx