Proliferated Warfighter Space Architecture Tranche 3 Tracking Layer (T3TRK)
SAM.GOV
Due: May 22, 2025 at 04:00 PM UTC
In-Active Solicitation Source Url

Summary

The Proliferated Warfighter Space Architecture Tranche 3 Tracking Layer (T3TRK) opportunity is a solicitation issued by the Space Development Agency (SDA) aimed at prototyping a system that enhances the capability to detect, track, and identify missile threats, including advanced hypersonic systems. The project involves the procurement and deployment of at least 54 space vehicles equipped with infrared sensors across six orbital planes, with a fully deployed system expected to exceed 100 space vehicles in Low Earth Orbit. This initiative seeks contractors with expertise in satellite technology, missile defense systems, and advanced sensor integration, making it suitable for businesses specializing in aerospace, defense, and related technologies.
Description

The Space Development Agency (SDA) is issuing this Other Transaction Authority (OTA) solicitation for a prototyping effort of the Proliferated Warfighter Space Architecture (PWSA) Tranche 3 (T3) Tracking Layer (T3TRK). T3TRK prototyping effort will accelerate the capability to provide global, per

Entities
DOD
Department of Defense
DOTAF
Department of the Air Force
NAICS
541715
Set Aside
None
Point of Contact
Full Name Email Phone Type
[email protected] [email protected] None primary
Attachments
  • 5+-+T3TRK+Past+Performance+Questionnaire.pdf
  • 0+T3TRK+-+Program+Solicitation+-+Amendment+1+%284-28-25%29.pdf
  • 1e+-+T3TRK+Government+Furnished+Items+%28GFX%29.pdf
  • 3+-+T3TRK+Resume+Template+Rev+1+%284-28-25%29.pdf
  • 4+-+T3TRK+Personnel+Matrix.xlsx
  • 2+-+T3TRK+Personnel+and+Facilities+Template.pdf
  • 1+-+T3TRK+Other+Transaction+Agreement+%28OTA%29.pdf
  • 1f+-+T3TRK+DD+Form+254+TEMPLATE.pdf
  • 1g+-+T3TRK+Cost+and+Software+Data+Reporting+%28CSDR%29+Plan.xls
  • T3TRK+-+Solicitation+CoverLtr.pdf
  • 1b+-+T3TRK+Schedule+of+Milestones+Payments.pdf
  • 1d+-+T3TRK+Data+Rights+Assertion+Table.pdf