Purchase and Install Power Transformers
SAM.GOV
Due: June 18, 2025 at 06:00 PM UTC
In-Active Combined Synopsis/Solicitation SBA Source Url

Summary

The opportunity involves the purchase and installation of power transformers at Eglin Air Force Base, Florida, as outlined in a combined synopsis/solicitation. The project requires contractors to provide all necessary materials, labor, and equipment to replace existing transformers and light switches in accordance with the Statement of Work dated March 18, 2025. This is a competitive Request for Quote (RFQ) specifically set aside for small businesses, and the contract will be awarded to the lowest priced, responsible offeror who meets all technical requirements. Contractors with experience in electrical installations, particularly in military or airfield environments, should consider bidding on this opportunity.
Description

06/16/2025 Amendment 02.

This Amendment is to update Q and A document and provide “Eglin Master Safety Appendix C - July 1, 2022” and  “Eglin Precon-Briefing- 25 Sep 23” as Attachments 9 and 10, respectively.

--------------------------

Entities
DOD
Department of Defense
DOTAF
Department of the Air Force
NAICS
334416
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Ft Lauderdale , Florida 32542
Point of Contact
Full Name Email Phone Type
Liudmila "Lucia" Stidam [email protected] primary
Paul L. Brinckhaus [email protected] secondary
Attachments
  • SOW-Sunshade+Transformers.pdf
  • Combo+w+SV+33FW+Transformers_Redacted.pdf
  • FA282325Q3007+Q+and+As+Power+Transformers.pdf
  • FA282325Q3007+Q+and+As+Power+Transformers+3+June+2025.pdf
  • Attachment+4+E404EE41-ASEP-Layout1.pdf
  • Attachment+6+E408EE41-DSEPa-Layout1.pdf
  • Attachment+7+E409EE41-SLPP-Layout1.pdf
  • Attachment+5+E407EE41-DSEPa-Layout1.pdf
  • Attachment+8+E410EE41-SEEL-Layout1.pdf
  • Attachment+2+C406EE41-PMDT-Layout1.pdf
  • Attachment+3+E403EE41-ASEP-Layout1.pdf
  • Attachment+1+C117EE41-SSDT-Layout1.pdf
  • FA282325Q3007+Q+and+As+Power+Transformers+11+June+2025.pdf
  • Attachment+9+Eglin+Master+Safety+Appendix+C+-+1+July+2022.pdf
  • FA282325Q3007+Q+and+As+Power+Transformers+16+June+2025.pdf
  • Attachment+10+Eglin+Precon-Briefing-+25+Sep+23.pdf