RANGE 27 - ROAD RECONSTRUCTION AND WATER MITIGATION CHANNELS TO PREVENT RANGE EROSION ISO OPM-SANG, KSA
SAM.GOV
Due: May 25, 2025 at 12:00 PM UTC
In-Active Combined Synopsis/Solicitation Source Url

Summary

The opportunity titled 'RANGE 27 - ROAD RECONSTRUCTION AND WATER MITIGATION CHANNELS TO PREVENT RANGE EROSION ISO OPM-SANG, KSA' involves significant construction work aimed at repairing and enhancing the infrastructure of Range 27 located at Khashm Al Aan, Riyadh, Saudi Arabia. The project includes the reconstruction of access roads that have suffered from severe erosion and the construction of water mitigation channels to prevent further erosion and water pooling, which is critical for military training operations involving heavy vehicles and aviation firing. Contractors with experience in road construction, stormwater management, and military infrastructure projects are encouraged to bid on this opportunity, as it requires a comprehensive understanding of both technical and regulatory requirements, including adherence to safety standards and environmental considerations.
Description

AMENDMENT 0002 HEREBY CHANGES THE SOLICITATION DUE DATE AND ADDED ATTACHMENTS 0008 & 0009 - PLEASE READ B.08 SOLICITATION AMENDMENT W519TC25RA004 0002 COMPLETELY FOR FULL DETAILS.

___________________________________________________________________________________

Entities
DOD
Department of Defense
DOTA
Department of the Army
NAICS
236220
Set Aside
None
Place of Performance
RIYADH
Point of Contact
Full Name Email Phone Type
Shaniel Escoffery [email protected] primary
Linda Matos [email protected] secondary
Attachments
  • B.08+Attachment+0008+Questions+and+Answers.pdf
  • B.08+Attachment+0009+Range+27+Industry+Day+Presentation.pdf
  • B.08+Attachment+0006+-+Section+L.pdf
  • B.08+Attachment+0005+-+Past+Performance+Questionnaire.pdf
  • B.08+Attachment+0001+-+Statement+of+Work.pdf
  • B.08+Solicitation+Amendment+W519TC25RA004+0002.pdf
  • B.08+Attachment+0002+-+Pricing+Matrix.xlsx
  • B.08+Attachment+0007+-+Section+M.pdf
  • B.08+Solicitation+Amendment+W519TC25RA004+0001.pdf
  • B.08+W519TC25RA004.pdf
  • B.08+Attachment+0004+Requirements+for+Access+to+MNG+Base+OPM-SANG.pdf
  • B.08+Attachment+0003+-+QASP+Range+27.pdf