Repair King Drive - Grade and Pave
SAM.GOV
Due: July 30, 2025 at 08:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The opportunity titled 'Repair King Drive - Grade and Pave' involves significant infrastructure work at the Rock Island Arsenal in Illinois. The project includes the regrading and paving of King Drive, which will require the removal of existing Hot Mix Asphalt pavement and Portland Cement Concrete islands, as well as the construction of a new shared-use path and the relocation of an intersection. This project is particularly suited for small businesses specializing in road construction and paving, as it is set aside for total small business participation. Contractors should be prepared to meet bonding requirements and have experience with similar projects to ensure compliance with the scope of work.
Description

The Army Contracting Command - Rock Island requests a proposal for the Repair King Drive - Grade and Pave project on the Rock Island Arsenal, Rock Island, IL; see attachments for details. Included in the solicitation W519TC-25-R-A012 is information on an upcoming scheduled site visit.

Entities
DOD
Department of Defense
DOTA
Department of the Army
NAICS
237310
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Rock Island , Illinois 61299
Point of Contact
Full Name Email Phone Type
Lindsay Park [email protected] primary
Kathy Ward [email protected] secondary
Attachments
  • W519TC-25-R-A012.pdf
  • Attachment+0005+KING+DRIVE+SITE+LAYOUT+5-30-25.pdf
  • Attachment+0002+Appendix+A+FINAL+PLANS+2025-2923+KING+DRIVE+6-9-25.pdf
  • Attachment+0006+DB+Wage+Determination+30+May+2025.pdf
  • Attachment+0003+Appendix+B+Division+1+SPECS+2025-2923+KING+DRIVE.pdf
  • Attachment+0004+Appendix+C+Submittal+Register+2025-2923+KING+DRIVE.pdf
  • Attachment+0007+King+Drive+Project+Site+Visit+Location.pdf
  • Attachment+0001+SOW+2025-2923+KING+DRIVE+-+GRADE+AND+PAVE++6-9-25.pdf
  • Attachment+0008+Site+Visit+Sign+In+sheet.pdf
  • W519TC25RA012+Amendment+0001+14+July+2025.pdf
  • W519TC25RA012+Amendment+0002.pdf
  • Attachment+0002+Appendix+A+FINAL+PLANS+2025-2923+KING+DRIVE+Amended+22+July+2025.pdf
  • MEMORANDUM+FOR+RECORD+29+July+2025.pdf