Repair of NSN 6150015510754 for the GPS Program
SAM.GOV
Due: June 5, 2025 at 10:00 PM UTC
In-Active Solicitation Source Url

Summary

The opportunity involves the repair of National Stock Number (NSN) 6150015510754, which pertains to an electrical power strip used in the GPS program. The work requires a contractor capable of handling the repair and maintenance of military-grade electrical components, specifically those made of metal with copper. The contractor will be responsible for delivering two units within 30 days after receipt of carcass and two additional units within 90 days after the completion of a study. The solicitation is a sole source requirement directed to ENSIL Technical Services Inc., indicating that they are the only entity eligible to bid on this project. Interested contractors should have experience in military contracting, particularly in the repair of electrical components, and must comply with specific reporting and packaging requirements as outlined in the solicitation documents.
Description

PR Number(s): FD20202500668

Line Item: 0001

NSN: 6150015510754GO POWER STRIP,ELECTRI

P/N: PTXL-V016-1-05, P/N: RTL-S200018,

Description: Power strip

Supp. Description: Metal with copper

Quantity: 2.0000 EA

Delivery: *30 Days *ARO After Recei

Entities
DOD
Department of Defense
DOTAF
Department of the Air Force
NAICS
811210
Set Aside
None
Place of Performance
Point of Contact
Full Name Email Phone Type
Valerie Humphries [email protected] 8017756455 primary
TIMOTHY HOWARD [email protected] 8015868242 secondary
Attachments
  • ATTACHMENT_10_TRANSPORTATION.pdf
  • ATTACHMENT_1_CAVAF_REPORTING.pdf
  • ATTACHMENT_6_REPAIR_DATA_LIST.pdf
  • ATTACHMENT_2_ITEM_DESCRIPTION.pdf
  • ATTACHMENT_4_PACKAGING_SOW.pdf
  • SOL_FA825025Q0668.pdf
  • GFP.xlsx
  • ATTACHMENT_12_WAGE_DETERMINATION.pdf
  • ATTACHMENT_7_ITEM_UNIQUE_IDENTIFICATION.pdf
  • ATTACHMENT_9_CONTRACT_DATA_REQUIREMENTS_LIST.pdf
  • ATTACHMENT_3_SPECIAL_PACKAGING_INSTRUCTIONS.pdf
  • ATTACHMENT_8_PACKAGING_REQUIREMENT.pdf
  • ATTACHMENT_5_PERFORMANCE_WORK_SCHEDULE.pdf