Repair Purple Heart Drive Pavement - Dover AFB
SAM.GOV
Due: June 19, 2025 at 05:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The opportunity to repair Purple Heart Drive Pavement at Dover Air Force Base involves comprehensive construction work focused on specific sections of the roadway, namely Section 40 and Section 70. The project requires contractors to provide all necessary labor, materials, tools, and equipment to complete the repairs, which include milling, asphalt paving, and line striping, as detailed in the Statement of Work dated July 23, 2024. This solicitation is set aside for small businesses, making it an ideal opportunity for contractors specializing in pavement repair and construction services who meet the eligibility criteria outlined in the solicitation.
Description

This project focuses on repairing specific Purple Heart Drive Pavement sections to include those designated as Section 40 and Section 70. All construction work shall be performed in accordance with the Statement of Work (SOW) dated 23 July 2024, which provides more details of the requirements.

Entities
DOD
Department of Defense
DOTAF
Department of the Air Force
NAICS
237310
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Dover AFB , Delaware 19902
Point of Contact
Full Name Email Phone Type
SSgt Luis Rivera [email protected]. 3026775208 primary
Ms. Omelia Saunders [email protected] 3026775545 secondary
Attachments
  • Attachment+4+-+Operational+Climactic+Data+2018.pdf
  • Attachment+2+-++Bid+Schedule+Repair+Purple+Heart+Pavement.xlsx
  • Attachment+6+-+Dover+AFB+OPSEC+Awareness+Guide+for+Contractors.pdf
  • Attachment+5+-+Past-Present+Performance+Survey.pdf
  • Attachment+8+-+DAFB+AT+Awareness+for+Contractors+Trifold.pdf
  • Attachment+1+-+Statement+of+Work+-+Repair+Purple+Heart+Pavement.pdf
  • FA449725R0019+-+Repair+Purple+Heart+Pavement.pdf
  • Attachment+7+-+DAFB+AT+Awareness+Guide+for+Contractors.pdf
  • Attachment+3+-+Wage+Determination_Highway.pdf