Summary
The opportunity to repair the sewer line at Building 1107 involves replacing approximately 125 feet of a failed 6-inch terracotta sewer pipe with a new 6-inch Schedule 40 PVC pipe. The project requires the contractor to remove the existing pipe, connect the new pipe to the building's cleanout, and follow the existing line to the 15-inch sewer main. Additionally, the contractor will need to install a doghouse manhole and may have to remove a section of Michael Road and demo parts of an abandoned steam tunnel to facilitate the installation. This project is set at Marine Corps Base Camp Lejeune, North Carolina, and is a total small business set-aside, making it suitable for small contractors with experience in sewer line installation and related construction work. Contractors must coordinate with the Public Works Department for any necessary outages during construction and ensure minimal disruption to facility operations.