Repair Tiedowns and Apron Markings - Project Number JKSE 242430
SAM.GOV
Due: June 5, 2025 at 04:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The opportunity titled 'Repair Tiedowns and Apron Markings - Project Number JKSE 242430' involves a construction project at the Montana Air National Guard in Great Falls, Montana. The project requires contractors to provide all necessary labor, materials, equipment, and supervision to repair tiedowns and apron markings. This solicitation is specifically set aside for small businesses, indicating that only small business contractors are eligible to bid. The work is expected to be completed within 59 calendar days after the notice to proceed, and the estimated cost of the project falls between $500,000 and $1,000,000. Contractors with experience in similar construction projects, particularly those familiar with airfield operations and safety regulations, should consider bidding on this opportunity.
Description

6 June 2025

Abstract of Offers - Construction posted to Attachments/Links

28 May 2025

Questions and Answers dated 28 May 2025 have been uploaded to the attachments/links.

End of Updated Attachments/Links

21 May 2025 (Amendment 3)

The purpose of this

Entities
DOD
Department of Defense
DOTA
Department of the Army
NAICS
237310
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Great Falls , Montana 59404
Point of Contact
Full Name Email Phone Type
Anthony F. Barille [email protected] 4067910246 primary
Talon D. Urick [email protected] 4067910403 secondary
Attachments
  • Solicitation+Amendment+W50S7L25BA0020001+SF+30.pdf
  • JKSE242430+Repair+Tiedowns+and+Apron+Markings+-+Specifications.pdf
  • Performance+and+Payment+Bond+Checklist.pdf
  • JKSE242430+Repair+Tiedowns+and+Apron+Markings.pdf
  • Solicitation+Amendment+-+W50S7L25BA0020001.pdf
  • B4+-+WD+-+MT20250079+-+General+Decision+Number.pdf
  • Solicitation+-+W50S7L25BA002.pdf
  • B7+-+Pre-Bid+Conference+Minutes+-+W50S7L-25-B-A002.pdf
  • B7+-+Pre-Bid+Conference+Presentation+-+Repair+Tiedowns+and+Markings.pptx
  • B7+-+Pre-Bid+Site+Visit+-+Sign+in+Sheet.pdf
  • Questions+and+Answers+-+Dated+16+May+2025.pdf
  • B8+-+Solicitation+Amendment+W50S7L25BA0020002+SF+30.pdf
  • B8+-+Solicitation+Amendment+-+W50S7L25BA0020002.pdf
  • JKSE242430+Repair+Tiedowns+and+Apron+Markings+Drawings+dated+21+May+2025.pdf
  • B6+-+Questions+and+Answers+-+Dated+21+May+2025.pdf
  • B8+-+Solicitation+Amendment+-+W50S7L25BA0020003.pdf
  • B8+-+Solicitation+Amendment+W50S7L25BA0020003+SF+30.pdf
  • B6+-+Questions+and+Answers+-+Dated+28+May+2025.pdf
  • C4+-+Abstract+of+Offers+-+Construction+-+Bid+Opening+-+W50S7L-25-B-A002.pdf