Repair Waterfront - Phase I at USCG Station Portsmouth Harbor (New Castle, New Hampshire)
SAM.GOV
Due: May 22, 2025 at 08:00 PM UTC
In-Active Presolicitation SBA Source Url

Summary

The opportunity involves the Repair Waterfront - Phase I project at the USCG Station Portsmouth Harbor in New Castle, New Hampshire. This presolicitation notice indicates a requirement for a Firm Fixed Price (FFP) contract focused on various structural repairs to the existing boathouse pier system and floating docks. The work includes replacing failed timber bracing, deteriorated timber strakes, damaged rubber d-fenders, and other incidental repairs. This project is set aside for small businesses, making it an ideal opportunity for contractors specializing in marine construction and repair, particularly those with experience in waterfront projects and compliance with federal regulations.
Description

Repair Waterfront – Phase I at USCG Station Portsmouth Harbor (New Castle, New Hampshire)

THIS IS A PRESOLICITATION NOTICE ONLY. THIS IS NOT A REQUEST FOR PROPOSAL. NO SPECIFICATIONS OR DRAWINGS ARE AVAILABLE AT THIS TIME.

United States Coast Guard Civil Engineering U

Entities
HSDO
Department of Homeland Security
UCG
U.S. Coast Guard
NAICS
237990
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
New Castle , New Hampshire 03854
Point of Contact
Full Name Email Phone Type
Cam Ormiston [email protected] 4017361731 primary
Sean Waldron [email protected] 4017361721 secondary