Replace 22kV HT Panel Charger, Backup Battery and partial discharge testing of 2 transformers in US Embassy Singapore.
SAM.GOV
Due: June 9, 2025 at 08:30 AM UTC
In-Active Solicitation Source Url

Summary

The opportunity involves the replacement of a 22kV High Tension (HT) panel charger and backup battery system, along with conducting partial discharge testing of two transformers at the U.S. Embassy in Singapore. This project aims to enhance the reliability and safety of the embassy's electrical systems. Contractors with expertise in electrical installations, particularly those familiar with high voltage systems and transformer testing, are encouraged to bid. The work includes the removal of existing equipment, procurement and installation of new components, and thorough testing to ensure compliance with safety standards. Additionally, contractors must manage project logistics and adhere to environmental regulations regarding waste disposal.
Entities
SDO
Department of State
NAICS
238210
Set Aside
None
Place of Performance
Singapore , Central Singapore 258508
Point of Contact
Full Name Email Phone Type
Liam E. Fitzgerald [email protected] 6564769108 primary
Liam E. Fitzgerald [email protected] 6564769108 secondary
Attachments
  • Attachment+2+-+CERTIFICATION+REGARDING+COMPLIANCE+WITH+APPLICABLE+FEDERAL+ANTI-DISCRIMINATION+LAW.pdf
  • Attachment+1+-+RFQ+19SN1025Q0023+SOW.pdf
  • RFQ+19SN1025Q0023.pdf