SAM.GOVDue: May 20, 2025 at 06:00 PM UTCIn-ActiveSolicitationSBASource Url
Summary
The opportunity involves a construction project to replace the chillers and cooling system at the Federal Correctional Complex in Tucson, Arizona. The selected contractor will be responsible for the complete preparation of the site, including the demolition and removal of existing equipment, and the installation of new high-efficiency centrifugal chillers and a cooling tower. This project requires a contractor with experience in HVAC systems, particularly in a correctional facility setting, as well as the ability to manage the complexities of working within a secure environment. Contractors should be prepared to provide all necessary labor, materials, and equipment to complete the project within the specified timeframe of 364 calendar days from the notice to proceed.