Replace Chillers & Cooling System at FCC Tucson
SAM.GOV
Due: May 8, 2025 at 06:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The opportunity to replace the chillers and cooling system at the Federal Correctional Complex (FCC) Tucson involves a comprehensive construction project that includes the demolition and removal of existing equipment, as well as the installation of new high-efficiency centrifugal chillers and a cooling tower. Contractors will be responsible for preparing the site, connecting a mobile chiller to the existing chilled water loop, and making necessary modifications to the electrical power supply. This project is particularly suited for small businesses specializing in HVAC systems and construction, as it is a 100% small business set-aside. Interested contractors should be prepared to meet the specific requirements of working within a correctional facility environment, which may include security clearances and adherence to strict regulations.
Description

Amendment 0001- Posted 04/28/2025

  • Attachment A: Sign In Sheet & Meeting Minutes

           ** PHOTOS and Q&A's WILL BE POSTED AT A LATER DATE VIA AMENDMENT **

Entities
JDO
Department of Justice
FPS/BOP
Federal Prison System / Bureau of Prisons
NAICS
238220
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Tucson , Arizona 85756
Point of Contact
Full Name Email Phone Type
Krista Sua [email protected] primary
Attachments
  • Criminal+History+Check+Form.pdf
  • Attachment+A.+++Sign+In+Sheet+and+Meeting+Minutes.pdf
  • WD_+AZ20250040.pdf
  • Instruction+to+Bidders.pdf
  • Solicitation+15BFA025B00000021.pdf
  • Amendment+0001.pdf
  • Bid+Bond+SF24+EXP+01.2027+1.pdf