Replace Chillers & Cooling System at FCC Tucson
SAM.GOV
Due: May 20, 2025 at 06:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The opportunity involves a construction project for the Federal Bureau of Prisons to replace the chillers and cooling system at the Federal Correctional Complex in Tucson, Arizona. The selected contractor will be responsible for the complete preparation of the site, including the demolition and removal of existing equipment, and the installation of new high-efficiency centrifugal chillers and a cooling tower. This project requires a contractor with experience in HVAC systems, particularly in a correctional facility setting, and the ability to manage the complexities of such an environment. The work must be completed within 364 calendar days from the notice to proceed, and the project is set aside for small businesses, making it an ideal opportunity for contractors that meet the small business size standards.
Description

Amendment 0002- Posted 05/05/2025

  • BID EXTENSION:  TUESDAY, MAY 20, 2025 at 11:00 AM

           ** PHOTOS and Q&A's WILL BE POSTED AT A LATER DATE VIA AMENDMENT **

Entities
JDO
Department of Justice
FPS/BOP
Federal Prison System / Bureau of Prisons
NAICS
238220
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Tucson , Arizona 85756
Point of Contact
Full Name Email Phone Type
Krista Sua [email protected] primary
Attachments
  • Criminal+History+Check+Form.pdf
  • Attachment+A.+++Sign+In+Sheet+and+Meeting+Minutes.pdf
  • WD_+AZ20250040.pdf
  • Instruction+to+Bidders.pdf
  • Amendment+0002+.pdf
  • Solicitation+15BFA025B00000021.pdf
  • Amendment+0001.pdf
  • Bid+Bond+SF24+EXP+01.2027+1.pdf