Replace Chillers - USP Lewisburg
SAM.GOV
Due: May 20, 2025 at 07:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The opportunity to replace chillers at the United States Penitentiary (USP) Lewisburg involves a firm-fixed-price construction contract. The project requires the contractor to provide all necessary labor, materials, and equipment to demolish the existing chillers and install two new 400-ton centrifugal chillers at the facility's Powerhouse. This work is critical for maintaining the facility's operational efficiency and climate control. Contractors with experience in HVAC systems, particularly in a correctional facility environment, are encouraged to bid on this project. The performance period is set for 364 calendar days from the notice to proceed, and the estimated project cost is between $500,000 and $1,000,000, making it suitable for small businesses as this is a 100% small business set-aside.
Description

Bid Abstract attached 5/20/2025

Amendment 00003- The purpose of this amendment (0003) is to correct a typographical error in Amendment 0002.
Amendment 0002 incorrectly stated that the bid submission deadline was "Monday, May 20." The correct day is

Entities
JDO
Department of Justice
FPS/BOP
Federal Prison System / Bureau of Prisons
NAICS
238220
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Pennsylvania 17837
Point of Contact
Full Name Email Phone Type
Joshua Cortez [email protected] 623-465-5130 primary
Attachments
  • Wage+Determination+PA20250069+Mod+3.pdf
  • Instructions+to+Bidders.pdf
  • Amendment+00002.pdf
  • Criminal+History+Check+Form.pdf
  • Amendment+00001.pdf
  • Bid+Bond+SF24.pdf
  • 15BFA025B00000007.pdf
  • Amendment+00003.pdf
  • Bid+Abstract.pdf