Replace Restroom Doors
SAM.GOV
Due: May 22, 2025 at 09:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The opportunity titled 'Replace Restroom Doors' is a solicitation issued by the Naval Undersea Warfare Center Division (NUWC) Keyport, aimed at replacing two existing restroom doors and frames with new steel doors and frames. The project also includes repairing any damaged drywall and painting to match the existing color. This work is categorized under non-commercial services and is set aside for small businesses, with a firm fixed price construction contract anticipated. Contractors with experience in finish carpentry and those who can comply with safety and environmental regulations are encouraged to bid on this project, which is expected to be performed at the Keyport, WA location. The estimated cost for this project ranges from $15,000 to $50,000, and the deadline for proposals is May 22, 2025.
Description

This solicitation is issued in support of Naval Undersea Warfare Center Division (NUWC) Keyport for replacement of two existing restroom doors and frames with two new steel doors and frames, repair any damaged drywall, and paint to match existing color. This requirement is being issued as a Reque

Entities
DOD
Department of Defense
DOTN
Department of the Navy
NAICS
238350
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Keyport , Washington 98345
Point of Contact
Full Name Email Phone Type
Michelle Farrales [email protected] primary
James Wasson [email protected] 360-396-2935 secondary
Attachments
  • C11d_Att_07_Past_Performance_References.docx
  • C12_Att_10_Safety_Data_Sheet.docx
  • C12_Att_09_PPI_Form.docx
  • C12_Att_05_OPSEC_Guide_for_Defense_Contractors.pdf
  • C11_N0025325Q0009.pdf
  • C12_Att_11_OSHA_Calculating_Injury_and_Illness_Incident_Rate.pdf
  • C12_Att_03_Safety_Requirements_for_Contractors_and_Subcontractors.pdf
  • C11b_Att_02_WD_WA20250109_03072025.pdf
  • C12_Att_08_Bid_Form.xlsx
  • C12_Att_04_Kpt_EV_Guide_for_Contractors_Jan_2025.pdf
  • C12_Att_01_Material_Equipment_In_Place_List.xlsx
  • C12_Att_06_Schedule_of_Values.xlsx