Replace Switchgear- FCC Forrest City
SAM.GOV
Due: May 13, 2025 at 06:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The opportunity titled 'Replace Switchgear- FCC Forrest City' involves a construction project at the Federal Correctional Complex in Forrest City, Arkansas. The primary objective is to remove the existing 15KV switchgear and install a new 15KV switchgear assembly. This project is a firm-fixed-price contract and is set aside exclusively for small businesses, making it an ideal opportunity for contractors specializing in electrical work and switchgear installation. Interested bidders must ensure they meet the small business size standards and are registered in the System for Award Management (SAM). The performance period for the project is 364 calendar days from the notice to proceed, and the estimated project cost is between $1 million and $5 million.
Description

Amendment 0001- Incorporate contractor question responses and pre-bid site visit minutes and sign in sheet.

Solicitation

The Federal Bureau of Prisons (FBOP) is issuing solicitation 15BFA025B00000020 for the award of a firm-fixed-price constructi

Entities
JDO
Department of Justice
FPS/BOP
Federal Prison System / Bureau of Prisons
NAICS
238210
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Forrest City , Arkansas 72335
Point of Contact
Full Name Email Phone Type
Patrick Ford [email protected] primary
Attachments
  • Bid+Bond+SF24.pdf
  • Wage+Determination+AR20250022.pdf
  • Bid+Abstract.pdf
  • Instructions+to+Bidders.pdf
  • Solicitation+Document.pdf
  • Criminal+History+Check+Form.pdf