Request for Information (RFI) #02: Instrumentation Range Support Program IV
SAM.GOV
Due: June 16, 2025 at 07:30 PM UTC
In-Active Special Notice Source Url

Summary

The Request for Information (RFI) #02 for the Instrumentation Range Support Program IV (IRSP IV) seeks to gather industry insights on capabilities to perform pre-overhaul and overhaul services for various Instrumentation Tracking Systems (ITS). This includes the potential for conducting concurrent overhauls at multiple global locations. The opportunity is aimed at contractors with expertise in systems engineering, maintenance, and support for complex instrumentation systems, particularly those with experience in radar, telemetry, and related technologies. Interested businesses should be prepared to demonstrate their ability to manage large-scale projects and provide detailed capability statements that address the specific systems outlined in the RFI.
Description

13 Jun 2025- The submission/response date for RFI#02 has been extended to 3:30 EST PM on 16 Jun 2025.

29 May 2025- RFI#02 Requesting additional information from industry to identify the capabilities to comp

Entities
DOD
Department of Defense
DOTAF
Department of the Air Force
NAICS
334511
Set Aside
None
Place of Performance
Patrick Air Force Base , Florida 32925
Point of Contact
Full Name Email Phone Type
Sandra M. Seman [email protected] 3214943934 primary
Jeremiah Small [email protected] 3214947093 secondary
Attachments
  • Attachment+7+System+Summary.pdf
  • Attach+2-+Industry+Day+Registration+Form.pdf
  • RFI+02+IRSP+IV+%2829+May%29.pdf
  • Industry+Day+Notice.pdf
  • Questions+and+Answers+%2816+May+2025%29.pdf
  • C003+Manhour+Estimate+Technical+Cost+Proposals+%28Technical+Cost+Proposal%29.pdf
  • IRSP+IV+Draft+SOWv4+%2818+Apr+2025%29.pdf
  • Attachment+7a+-+Supported+Range+System+List+%28Template%29.xlsx
  • Attachment+11+PALT+Thresholds+%28v2%29.pdf
  • D004+Detail+Specification+Documents+%28Overhaul+Work+Specification%29.pdf
  • E002+Test_Inspection+Report+%28Overhaul+Test+and+Evaluation+and+Accomplishment+Summary%29.pdf
  • Sign-In+Sheet+%2824+Apr%29.pdf
  • IRSP+Industry+Day+Slides+for+Posting+%2824+Apr%29.pdf
  • Attachment+5+-+Stock+Replenishment+Concept+of+Operations+CONOPS.pdf
  • E001+Test_Inspection+Report+%28Pre-Overhaul+Report%29.pdf
  • Attach+1+-+IRSP+III++Industry+Day+Agenda.pdf
  • Attachment+8+-+Range+Resource+List.pdf
  • Company+Question+Sheet.docx
  • Revised+RFI+02+IRSP+IV+%2813+Jun%29.pdf