RFP_356331_Reactive_Power_Compensation_AE
SAM.GOV
Due: June 6, 2025 at 07:00 PM UTC
In-Active Sources Sought Source Url

Summary

The opportunity titled RFP_356331_Reactive_Power_Compensation_AE is a Sources Sought notice issued by the SLAC National Accelerator Laboratory, seeking qualified Architectural and Engineering (A/E) firms to provide design and engineering services for the demolition and construction related to reactive power compensation systems. The selected contractor will be responsible for the demolition of two metal buildings, the installation of new power factor correction systems, and the provision of detailed designs including harmonic studies and construction support services. This opportunity is ideal for engineering firms with experience in similar projects, particularly those located within the specified Bay Area counties, as they will need to collaborate closely with SLAC personnel and adhere to specific design standards and regulations.
Description

THIS IS FOR SOURCES SOUGHT ONLY, DO NOT SUMBIT BIDS. While the draft RFP package has been included with this post, the RFP has not been released. These draft documents provided are subject to change and should not be construed as a solicitation. SLAC intends to issue a formal solicitation later b

Entities
EDO
Department of Energy
NAICS
541330
Set Aside
None
Place of Performance
Menlo Park , California 94025
Point of Contact
Full Name Email Phone Type
doreen agbayani [email protected] primary
Attachments
  • B2_04-3_SLAC_Electrical_Design_Standards_SLAC+I+708+104+007_DRAFT.pdf
  • B2_05_Section_F_%28Deliveries_Performance%29_DRAFT.pdf
  • B2_08_Section_J_%28List+of+Attachments%29_DRAFT.pdf
  • B2_01-1_SLAC_Attachment_A_Clarifications_DRAFT.pdf
  • B2_02_Section_A_%28Subcontract_Form%29_DRAFT.pdf
  • B2_06_Section_G_General_TsCs_DRAFT.pdf
  • B2_07_Section_H_%28Special_TsCs%29_DRAFT.pdf
  • B2_06-1_Architect_Engineer_Subcontracts_%28Aug2023%29.pdf
  • B2_04_Section_C_Cover_%28Specs_SOW%29_DRAFT.pdf
  • B2_08-2_Release_of_Claims_%28Assignment+and+Release%29_DRAFT.pdf
  • B2_01_SOQ_DRAFT.pdf
  • B2_06-2_Green_On_Site_Services_Rider_%28January_2025%29.pdf
  • B2_09-1_Reps_and_Certs_Supplement_DRAFT.pdf
  • B2_03_Section_B_%28Supplies+or+Services+and+Price_Costs%29.pdf
  • B2_09_Section_K_%28Rep+and+Certs%29.pdf
  • B2_04-2_Seismic+Design+Specifications+for+Buildings_Structures_Equipment_Systems_2023.pdf
  • B2_00_Cover_Letter_DRAFT.pdf
  • B2_04-1_Master+Substation+Reactive+Power+Compensation+AE+Design+Services_R0_signed.pdf
  • B2_08-1_Section_J_Subcontractor_Form_IIPP_052121_DRAFT.pdf