SAM.GOVDue: May 6, 2025 at 03:00 PM UTCIn-ActiveSolicitationSBASource Url
Summary
The Rivers Project Office Boundary Maintenance opportunity involves the maintenance of the US Army Corps of Engineers (USACE) boundary line along specific sections of the Mississippi River and the Lower Illinois River. This project encompasses approximately 50.05 miles of boundary, requiring the replacement of missing and damaged monuments by a certified surveyor, with a provision for up to 108 surveyor hours. Contractors with expertise in surveying, boundary maintenance, and those who meet the small business criteria are encouraged to bid on this solicitation, which is set aside for total small businesses under the SBA guidelines.
Description
This project involves the maintenance of USACE boundary line along Mississippi River Pools 24 and 26, Lower Mississippi Pool 27 (between Mississippi River Miles 181 and 298), and along the Lower Illinois River (between Illinois River Miles 7 and 15)(Figure 1). Total distance is approximately 50.05 m