Rogue River South Jetty Partial Repair 2025
SAM.GOV
Due: May 4, 2025 at 07:00 PM UTC
In-Active Sources Sought Source Url

Summary

The Rogue River South Jetty Partial Repair 2025 project involves significant repair work at the inlet to the Rogue River in Gold Beach, Curry County, Oregon. The scope includes the procurement, delivery, and placement of jetty armor stone, focusing on mandatory repairs to the toe and side slopes of the jetty, particularly addressing a channel-side damage zone. Contractors with experience in heavy civil engineering construction, particularly those familiar with marine and coastal projects, are encouraged to bid. The work is expected to take place between August 2025 and January 2026, with a total construction length of approximately 260 feet for mandatory repairs and additional optional repairs. This opportunity is open to both large and small businesses, including those that qualify as small disadvantaged, HUBZone, woman-owned, service-disabled veteran-owned, and veteran-owned businesses.
Description

The project is located on the Southern Oregon Coast at the inlet to Rogue River in Gold Beach, Curry County, Oregon. The project consists of procurement, delivery, and placement of jetty armor stone between stations 7+10 and 10+80. The mandatory work includes toe and side slope repairs to address

Entities
DOD
Department of Defense
DOTA
Department of the Army
NAICS
237990
Set Aside
None
Place of Performance
26250
Point of Contact
Full Name Email Phone Type
Christopher Burroughs [email protected] primary
Brian Johnson [email protected] 5039958330 secondary
Attachments
  • DRAFT+DRAWING+-+NOT+FINAL+DESIGN+-+Rogue+River+South+Jetty+Partial+Repair+2025.pdf
  • Sources+Sought+-+Rogue+River+South+Jetty+Partial+Repair+2025.pdf