SAM.GOVDue: April 24, 2025 at 05:00 PM UTCIn-ActiveSolicitationSBASource Url
Summary
The Sacramento River Erosion (SRE) C5 Pioneer Bridge Levee Improvements project is a significant construction opportunity aimed at enhancing levee stability and reducing the risk of erosion-related breaches along the Sacramento River. This design-bid-build project, located under the I-80 Pioneer Bridge in Sacramento, California, involves the implementation of various erosion protection measures, including the installation of rock bank protection and a soil-rock mix to safeguard the levee from wave action and erosion. Contractors with expertise in civil engineering, particularly those experienced in levee construction and erosion control, are encouraged to bid on this project. The work will be conducted from a barge, emphasizing the need for contractors familiar with marine construction techniques. This opportunity is set aside for small businesses, making it accessible for qualified contractors in the region.
Description
AMENDMENT 0002 - update the Technical Specifications Section 01 50 00, paragraph 2.2.2.1 (c) and include the date, time, and teams link for the bid opening.AMENDMENT 0001 - replaced specifications in its entirety and updated wage determination. Project is design-bid-build construction services to co