Our AI platform powers the best government contractors to win more.
Be the first to know, bid, and win.
The work includes annual maintenance dredging of the San Joaquin/Port of Stockton River DWSC to -35-ft (MLLW) plus 1-ft of paid over-depth, except the Sediment Trap, which shall be dredged to -38.5-ft (MLLW) plus 1-ft of paid over depth. All dredge material is suitable for the upland sites
Full Name | Phone | Type | |
---|---|---|---|
Suntok Mcguinness | [email protected] | 4155032953 | primary |
Mary C. Fronck | [email protected] | 4155036554 | secondary |