Security Gate Replacement at Farmington, NY (FRG) Air Traffic Control Facility
SAM.GOV
Due: May 2, 2025 at 09:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The opportunity involves the replacement of security gates at the Farmington, NY Air Traffic Control Facility. The contractor will be responsible for providing all necessary labor, tools, equipment, materials, and other incidentals to remove and replace existing gates and fencing, install a new motorized vehicle gate with card reader access, and integrate these systems into the existing security framework. This project is a total small business set-aside, making it ideal for small contractors with experience in security installations and construction. Bidders should be prepared to demonstrate their capability to manage the technical and logistical aspects of the project, including compliance with FAA standards and the Davis-Bacon Act for wage determinations.
Entities
TDO
Department of Transportation
FAA
Federal Aviation Administration
NAICS
238990
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Point of Contact
Full Name Email Phone Type
Chase Bartlett [email protected] primary
Josh Huckeby [email protected] secondary
Attachments
  • 6973GH-25-Q-00069.pdf
  • Attachment+05_Contractor+Release+Form+DOT+F+4220.4.doc
  • Attachment+02_FRG+ATCT+electrical+site+plan_+existing.pdf
  • Attachment+04_DBA+WD_NY20250032_SAM.gov.pdf
  • Attachment+03_FRG+ATCT+utility+plan_+landscaping+plan_+existing.pdf
  • Attachment+06_Statement+of+Work+%28SOW%29.pdf
  • Attachment+01_Drawing+package+-+FRG+rear+parking+lot+security+additions_+final.pdf