SLAC Substation 515 Upgrade Project
SAM.GOV
Due: April 29, 2025 at 12:00 AM UTC
In-Active Sources Sought Source Url

Summary

The SLAC Substation 515 Upgrade Project is a design-build contract opportunity aimed at replacing and retrofitting critical electrical infrastructure at the SLAC National Accelerator Laboratory in Menlo Park, California. This project specifically involves the replacement of the existing 12kV-480/277V transformer and low voltage switchboard, which are essential for the operation of the SPEAR3 Injector housed in Building 140. The work is scheduled to take place during a limited timeframe in the summer of 2025, coinciding with a scheduled downtime when no beam is delivered to the synchrotron. Contractors with experience in electrical systems, particularly those familiar with Department of Energy (DOE) and Department of Defense (DOD) facilities, are encouraged to express their interest in this opportunity, as the project requires adherence to strict safety and operational standards.
Description

THIS POSTING IS FOR "SOURCES SOUGHT ONLY."


PLEASE DO NOT SUBMIT PROPOSALS AT THIS TIME.


While the DRAFT RFP (Request for Proposal) package has been included with this post for your reference, the RF

Entities
EDO
Department of Energy
NAICS
238210
Set Aside
None
Place of Performance
Menlo Park , California 94025
Point of Contact
Full Name Email Phone Type
Jennifer Jamison [email protected] primary
Attachments
  • B2_03.4_STRUCTURAL_CALCULATIONS_B0140_SSRL_A5k+XFRMR_PAD.pdf
  • B2_05.1_Section_G_Fixed_Price_Construction_March2024.pdf
  • B2_10.0_RFP_Section_M_Evaluation_Factors.pdf
  • B2_07.9_SSRL_Substation_515_Upgrade_Bid_Breakdown_Form.xlsx
  • B2_07.6_RFP_Section_J_NTP_Submittal_Checklist.pdf
  • B2_00_RFP_354944_Cover_Letter_SSRL_Substation_515_Upgrade.pdf
  • B2_03.5_DIVISION_01_CONSTRUCTION_SPECS_S515_UPGRADES.pdf
  • B2_04_RFP_Section_F_%28Deliveries+Performance%29.pdf
  • B2_03.2_ELECTRICAL_SPECS_B0140.2023.01_A5K+XFMR+%26+LV+SWBD_032525.pdf
  • B2_01_RFP_Section_A_%28Subcontract_Form%29.docx
  • B2_07.3_Work_Classification_354944.pdf
  • B2_03.0_RFP_Section_C_%28Specifications_SOW%29.pdf
  • B2_09.1_Section+L_RFP_354944_RFI_Log.docx
  • B2_09.0_RFP_Section_L_Instructions_to_Offerors.pdf
  • B2_05.2_Section_G_Design-Build_Rider_to_Fixed_Price_Construction_Aug2022.pdf
  • B2_08.1_Section_K_Reps_and_Certs_Supplement_08.25.22.pdf
  • B2_06_Section_H_%28Special_TsCs%29.pdf
  • B2_03.1_SOW_Sub_515_Upgrade_Design_Bid_Build_032425.pdf
  • B2_02_RFP_Section_B_%28Supplies+or+Services+and+Price_Costs%29.docx
  • B2_07.0_RFP_Section_J_%28List_of_Attachments%29.pdf
  • B2_07.4_RFP_Section_J_SF1413.pdf
  • B2_03.3_DRAWINGS_B0140.2023.01_A5K+XFMR+%26+LV+SWBD_032525.pdf
  • B2_05.0_Section_G_%28General_TsCs%29.pdf
  • B2_07.7_RFP_Section_J_Construction_Subcontracts_Final_Release.docx
  • B2_07.2_Sec_J_Subcontractor_Form_IIPP.pdf
  • B2_07.8_RFP_Section_J_Final_Inspection_Report.docx
  • B2_08.0_RFP_Section_K_%28Rep+and+Certs%29.pdf
  • B2_07.5_RFP_Sec_J_SubcontractorFormSQF.pdf
  • B2_07.1_DBA_WD_CA20250018_032125_Mod_6.pdf