SOLICITATION: REPLACE ROOF HATCH AND DOORS AT THE WILMINGTON INTERNATIONAL AIRPORT (ILM) AIR TRAFFIC CONTROL TOWER AND BASE BUILDING IN WILMINGTON, NC
SAM.GOV
Due: April 29, 2025 at 09:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The opportunity involves replacing the roof hatch and doors at the Wilmington International Airport (ILM) Air Traffic Control Tower and base building in Wilmington, North Carolina. The project requires a contractor to replace six exterior doors and one interior door, as well as to add hardware to one interior door. The work includes measuring existing openings, removing old doors and hardware, installing new doors and hardware according to specifications, and ensuring that the new installations match the existing finishes. This project is set aside for small businesses, making it an ideal opportunity for contractors specializing in construction, particularly those with experience in airport facilities or similar environments.
Entities
TDO
Department of Transportation
FAA
Federal Aviation Administration
NAICS
236220
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Wilmington , North Carolina 28405
Point of Contact
Full Name Email Phone Type
Stephen Branch [email protected] primary
Attachments
  • QandA+Sheet+6973GH-25-Q-00084.pdf
  • Wage+Determination_New+Hanover+NC.pdf
  • Contractors+Release+Form+DOT+F+4220.4.doc
  • SOW+ILM+ATCT+-+Hatch+Doors.pdf
  • 6973GH-25-Q-00084.pdf
  • Drawings+ILM+Doors.pdf
  • Offeror+Organizational+Experience+Form.pdf