Sources Sought Announcement - FY25/26 B-21 Construction Projects - Ellsworth AFB, SD - Boilers
SAM.GOV
Due: April 30, 2025 at 05:00 PM UTC
In-Active Sources Sought Source Url

Summary

The Sources Sought Announcement for FY25/26 B-21 Construction Projects at Ellsworth Air Force Base, SD, focuses on the procurement of Advanced Thermal Hydronics (ATH) KN Series Boilers for three specific construction contracts. The U.S. Army Corps of Engineers is conducting market research to identify potential sources capable of providing the required boiler equipment, which is essential for the successful completion of the B-21 program. Contractors with experience in manufacturing or supplying boiler systems, particularly those familiar with the ATH brand, are encouraged to respond. The projects include the ADD Sim Phase 2 and renovations of Docks 92 and 93, with an estimated total product value of approximately $600,000. The announcement emphasizes the need for high-efficiency, reliable boiler systems that can withstand the harsh environmental conditions of South Dakota, making it crucial for interested businesses to demonstrate their capabilities in providing such equipment.
Description

SOURCES SOUGHT TECHNICAL DESCRIPTION FOR ADVANCED THERMAL HYDRONICS (ATH) KN SERIES BOILERS – VARIOUS B-21 PROJECTS AT ELLSWORTH AFB, SD

NOTICE ID: W9128F25SM031

INTRODUCTION

The US Army Corps of E

Entities
DOD
Department of Defense
DOTA
Department of the Army
NAICS
332410
Set Aside
None
Place of Performance
Ellsworth AFB , South Dakota 57706
Point of Contact
Full Name Email Phone Type
Scott Dwyer [email protected] 4029952584 primary
Brittany Gull [email protected] secondary
Attachments
  • A02.10_Sources-Sought-Technical-Description-Products-ATH+KN+Boiler_v3+-+Programmatic+04.11.2025.pdf
  • Boilers+-+Enclosure+1+-+May+2018+Category+Intelligence+Report.pdf
  • Boilers+-+Enclosure+2+-+EAFB+ATH+Boiler+BNA+Guidance.pdf