Spanish Fork Ad Site HVAC Replacement
SAM.GOV
Due: May 15, 2025 at 07:00 PM UTC
In-Active Combined Synopsis/Solicitation SBA Source Url

Summary

The Spanish Fork Ad Site HVAC Replacement project involves the complete retrofit and reconstruction of the heating, ventilating, and air conditioning (HVAC) system for the existing building located in Spanish Fork, Utah. This includes the removal and storage of the current 4-ton AC unit and furnace, installation of new HVAC units, a concrete pad for the new AC unit, and a mini-split system, all in accordance with specified guidelines. Contractors with expertise in HVAC systems, particularly those who are small businesses, are encouraged to bid on this project as it is set aside for small businesses. The project is estimated to cost between $25,000 and $100,000, and the work must be completed within 60 days of receiving the notice to proceed.
Description

This project includes all requirements necessary for the retrofit and reconstruction of an efficiently operating Heating, Ventilating, and Air Conditioning system for the existing Spanish Fork Ad Site Building. This will include removal and storage of the existing 4ton AC unit and furnace. With t

Entities
ADO
Department of Agriculture
FS
Forest Service
NAICS
238220
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Spanish Fork , Utah 84660
Point of Contact
Full Name Email Phone Type
Chris Hansen [email protected] 385-509-1895 primary
Attachments
  • 1240LS25Q0016-SF+Ad+Site+HVAC-final.pdf
  • Attachment+2-Wage+Determination-Building-Utah+County+3-14-2025.pdf
  • Attachment+3-SF+Adsite_Trailer_Floorplan_Final.pdf
  • SF30-amendment+1-extend+time-signed.pdf
  • Attachment+1-Specifications_SFAdSite_AC_Replacement.pdf