Steel Mezzanine Floor Construction
SAM.GOV
Due: May 15, 2025 at 02:00 PM UTC
In-Active Combined Synopsis/Solicitation Source Url

Summary

The U.S. Embassy in Dar es Salaam is seeking proposals for the construction of a steel mezzanine floor, which includes the design, fabrication, and installation of a steel storage cage and a mezzanine floor with a steel staircase. This project is aimed at enhancing the storage capabilities for office supplies. Contractors with experience in civil, building, and steel fabrication work, particularly those classified as class 6 and above by the Construction Regulatory Board (CRB) in Tanzania, are encouraged to submit their technical proposals and cost estimates. The project requires a comprehensive understanding of the specifications and standards outlined in the scope of work, and bidders must be prepared to provide all necessary labor, materials, and equipment to complete the project within the stipulated timeframe.
Description

The US Embassy Dar es Salaam wishes to solicit your technical proposal and proforma cost estimate on the construction of steel mezzanine floor as per scope of work (SOW). U.S. Government intends to award a contract to a reputable and responsible company submitting a quote which is technically acc

Entities
SDO
Department of State
NAICS
238120
Set Aside
None
Place of Performance
Dar es Salaam , Dar es Salaam
Point of Contact
Full Name Email Phone Type
Contracting Officer [email protected] primary
Attachments
  • SOW+PR15282470+Construction+of+Steel+Mezzanine+Floor.pdf
  • Advert+PR15282470-Construction+of+Steel+Mezzanine+Floor.pdf
  • Attachment+I+DRAWINGS.pdf
  • CERTIFICATION.docx