Tactical Infrastructure (TI) Maintenance DRT, LRT, RGV
SAM.GOV
Due: May 16, 2025 at 09:00 PM UTC
In-Active Presolicitation 8A Source Url

Summary

The Tactical Infrastructure (TI) Maintenance opportunity involves maintenance work along the international border in the Del Rio/Big Bend South, Laredo, and Rio Grande Valley Sectors, as required by the U.S. Customs and Border Protection. This presolicitation notice indicates that the work will include the design, construction, and installation of tactical infrastructure, specifically shelters that meet certain specifications. Contractors with experience in construction, particularly those familiar with federal, state, and local codes, as well as those who can provide licensed personnel for various subsystems, are encouraged to bid. The contract will be a firm-fixed price with a base year and four optional years, and attendance at mandatory site visits is required for consideration.
Description

This is a pre-solicitation notice of the U.S. Customs and Border Protection requirement for Tactical Infrastructre Maintenance along the international border in the Del Rio/Big Bend South, Laredo, and Rio Grande Valley Sectors. This is not a request for proposals - do not submit a proposal at thi

Entities
HSDO
Department of Homeland Security
UCABP
U.S. Customs and Border Protection
NAICS
237990
Set Aside
8A : 8(a) Set-Aside (FAR 19.8)
Place of Performance
Del Rio , Texas
Point of Contact
Full Name Email Phone Type
Allison Baker [email protected] (619) 216-4170 primary
Donna McMullen [email protected] (317) 339-7189 secondary
Attachments
  • 01C25R0038+Pre-Soliciation+Questions.pdf
  • 2.2.1+-+Attachment+4b+-+Statement+of+Work+Exhibit+B+-+Shelter+Specifications_.pdf
  • 2.2.1+-+Attachment+5d+-+LRT+Contractor+Scheduled+Work+Bid+Form_Template.xlsx
  • 01C25R0038+Pre-Soliciation+Questions_05082025.pdf
  • 2.2.1+-+Attachment+5c+-+DRT.BBT.S+Contractor+Unit+Pricing+Bid+Sheet+-+10hr+days_Template.xlsx
  • 2.2.1+-+Attachment+4a+-+Statement+of+Work+%28SOW%29_DRAFT.docx
  • 2.2.1+-+Attachment+5b+-+RGV+Contractor+Unit+Pricing+Bid+Sheet+-+10hr+days_Template.xlsx
  • 2.2.1+-+Attachment+2+-+Evaluation+Criteria_RGV.LRT.DRT+BBT+S+TI+Maint_DRAFT.docx
  • 2.2.1+-+Attachment+5e+-+LRT+Contractor+Unit+Pricing+Bid+Sheet+-+10hr+days_Template.xlsx
  • 2.2.1+-+Attachment+5a+-+DRT.BBT.S+Contractor+Scheduled+Work+Bid+Form_Template.xlsx
  • 2.2.1+-+Attachment+1+-+Cover+Letter_TIMaintenance_DRAFT.docx
  • 2.2.1+-+Attachment+6+-+Corporate+Interview+Questions_TIMaintenance_DRAFT.docx
  • 2.2.1+-+Attachment+3+-+Proposal+Instructions_TIMaintenance_DRAFT.docx
  • 01C25R0038+Pre-Soliciation+Questions_05072025.pdf
  • 01C25R0038+Pre-Soliciation+Questions+05142025.pdf
  • 2.2.1+-+Attachment+5f+-+RGV+Contractor+Scheduled+Work+Bid+Form_Template.xlsx
  • 2.2.1+-+Attachment+4c+-+Statement+of+Work+Exhibit+C+-+TI+Design+Standards_v5.pdf