Tactical Infrastructure (TI) Maintenance DRT, LRT, RGV
SAM.GOV
Due: May 16, 2025 at 09:00 PM UTC
In-Active Presolicitation 8A Source Url

Summary

The Tactical Infrastructure (TI) Maintenance opportunity involves the design, construction, and maintenance of tactical infrastructure shelters for the U.S. Customs and Border Protection (CBP) in Del Rio, Texas. This presolicitation notice indicates that the work will include the installation of pre-manufactured buildings and shelters, requiring contractors to have experience in construction and installation of such structures. The project will also necessitate compliance with various federal, state, and local codes, and contractors should be prepared to provide qualified personnel for all aspects of the installation, including electrical and HVAC systems. This opportunity is particularly suited for small businesses that qualify under the 8(a) program, as it is set aside for 8(a) contractors, and those with relevant experience in similar projects should consider bidding.
Entities
HSDO
Department of Homeland Security
UCABP
U.S. Customs and Border Protection
NAICS
237990
Set Aside
8A : 8(a) Set-Aside (FAR 19.8)
Place of Performance
Del Rio , Texas
Point of Contact
Full Name Email Phone Type
Allison Baker [email protected] (619) 216-4170 primary
Donna McMullen [email protected] (317) 339-7189 secondary
Attachments
  • 01C25R0038+Pre-Soliciation+Questions.pdf
  • 2.2.1+-+Attachment+4b+-+Statement+of+Work+Exhibit+B+-+Shelter+Specifications_.pdf
  • 2.2.1+-+Attachment+5d+-+LRT+Contractor+Scheduled+Work+Bid+Form_Template.xlsx
  • 01C25R0038+Pre-Soliciation+Questions_05082025.pdf
  • 2.2.1+-+Attachment+5c+-+DRT.BBT.S+Contractor+Unit+Pricing+Bid+Sheet+-+10hr+days_Template.xlsx
  • 2.2.1+-+Attachment+4a+-+Statement+of+Work+%28SOW%29_DRAFT.docx
  • 2.2.1+-+Attachment+5b+-+RGV+Contractor+Unit+Pricing+Bid+Sheet+-+10hr+days_Template.xlsx
  • 2.2.1+-+Attachment+2+-+Evaluation+Criteria_RGV.LRT.DRT+BBT+S+TI+Maint_DRAFT.docx
  • 2.2.1+-+Attachment+5e+-+LRT+Contractor+Unit+Pricing+Bid+Sheet+-+10hr+days_Template.xlsx
  • 2.2.1+-+Attachment+5a+-+DRT.BBT.S+Contractor+Scheduled+Work+Bid+Form_Template.xlsx
  • 2.2.1+-+Attachment+1+-+Cover+Letter_TIMaintenance_DRAFT.docx
  • 2.2.1+-+Attachment+6+-+Corporate+Interview+Questions_TIMaintenance_DRAFT.docx
  • 2.2.1+-+Attachment+3+-+Proposal+Instructions_TIMaintenance_DRAFT.docx
  • 01C25R0038+Pre-Soliciation+Questions_05072025.pdf
  • 2.2.1+-+Attachment+5f+-+RGV+Contractor+Scheduled+Work+Bid+Form_Template.xlsx
  • 2.2.1+-+Attachment+4c+-+Statement+of+Work+Exhibit+C+-+TI+Design+Standards_v5.pdf