SAM.GOVDue: May 23, 2025 at 10:30 PM UTCIn-ActiveSources SoughtSBASource Url
Summary
The opportunity involves upgrading the Central Chiller Plant and DDC Controls at the Long Beach VA Campus, specifically in Building 5A. The project requires a contractor to provide all necessary materials and labor to replace existing chillers, refurbish cooling towers, and upgrade associated pumps and controls to meet current codes and VA standards. The work includes civil, structural, electrical, and plumbing tasks, with a focus on minimizing disruption to patient care during the phased construction. Contractors with experience in HVAC systems, particularly in healthcare settings, and those familiar with VA standards are encouraged to bid on this project.
Description
Provide all material and labor required to upgrade central chiller plant and DDC controls in Building 5A of the Long Beach VA campus, to comply with the latest codes and VA standards. All construction shall be performed in accordance with drawings and specifications provided by the VA. This project