Upgrading Sewer Line Piping System & Lift Station
SAM.GOV
Due: July 30, 2025 at 08:00 PM UTC
In-Active Combined Synopsis/Solicitation SBA Source Url

Summary

The opportunity involves upgrading the sewer line piping system and lift station control system at the Falcon Power Plant in Starr County, Texas. The project requires a contractor to perform a comprehensive assessment of the existing underground sewer piping and electrical feeder wire, followed by the removal and disposal of outdated systems. The contractor will then install new sewer lines, replace the lift station control system, and upgrade the sump pump. This project is a total small business set-aside, making it ideal for small contractors with experience in site preparation and utility installation. Bidders should be prepared to demonstrate their technical approach, past performance on similar projects, and compliance with safety and regulatory standards.
Description

Amended PWS- See attachments.

Solicitation Number: 

FY2525570122 

Notice Type:  

Combined Synopsis/Solicitation  

Synopsis:  

This is a combined synopsis/solicitation for com

Entities
IBAWCU
International Boundary and Water Commission: U.S.-Mexico
NAICS
238910
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Falcon Heights , Texas 78545
Point of Contact
Full Name Email Phone Type
Suzette Smith [email protected] 9158324110 primary
Attachments
  • Illustration+1.pdf
  • PWS+FY25+Falcon+Sewer+Lines+and+Lift+Station+Upgrade+Pro_e.pdf
  • Price+Sheet+%281%29+%281%29.pdf
  • Applicable+Terms+and+Conditions.pdf
  • WD2015-5245.pdf
  • Amendment_1_QA.pdf
  • PWS-FY25-Falcon+Sewer+Lines+and+Lift+Station+Upgrade+Project+rev1++07_10_2025+.pdf
  • Septic+Tank+Drawing.pdf