Vault Toilet Installation at Modoc NF, Devil’s Garden-Warner Mountain RD
SAM.GOV
Due: May 6, 2025 at 09:00 PM UTC
In-Active Sources Sought Source Url

Summary

The opportunity for Vault Toilet Installation at Modoc National Forest, specifically at the Devil’s Garden-Warner Mountain Ranger District, involves a market survey to gauge contractor interest and capability for an upcoming project. The work entails the complete installation of two single-stall pre-cast concrete vault toilets, which includes manufacturing, delivery, and assembly at designated campgrounds. Contractors will need to provide all necessary labor, materials, tools, and equipment, including a crane for installation. This project is suitable for contractors with experience in heavy and civil engineering construction, particularly those who can meet the specifications for prefabricated vault toilets and manage the logistics of installation in remote locations. The anticipated project start date is Summer 2025, and interested contractors should be registered as small businesses under the relevant NAICS code.
Description

The Forest Service (FS) is conducting a market survey to determine the interest and capability of contractors for a possible upcoming project.  All costs associated with providing information in response to this market survey shall be the responsibility of the firm.  Any information sub

Entities
ADO
Department of Agriculture
FS
Forest Service
NAICS
237990
Set Aside
None
Place of Performance
Alturas , California 96101
Point of Contact
Full Name Email Phone Type
Richard Ortega [email protected] primary
Attachments
  • MR_Sources_Sought_Survey+-+Vault+Toilet+Installation+Project.docx