Our AI platform powers the best government contractors to win more.
Be the first to know, bid, and win.
The Contractor shall provide hardware to meet or exceed the specifications found below. Contractor shall utilize the design specifications and reference documentation to manufacturer VPX Chassis to support LHA6, LHD8 and LHA7 shipboard installation. LHD 8, LHA 6 and LHA 7 Class Machinery Control
Full Name | Phone | Type | |
---|---|---|---|
GRISEL VELAZQUEZ VARGAS | [email protected] | None | primary |
TIMOTHY SHUMAN | [email protected] | None | secondary |