SAM.GOVDue: June 26, 2025 at 06:00 PM UTCIn-ActiveCombined Synopsis/SolicitationSource Url
Summary
The opportunity titled "WORI REPLACE BOILER AT STANTON HOUSE" involves the replacement of the existing hot water system at the historic Elizabeth Cady Stanton House, part of the Women's Rights National Historical Park in Seneca Falls, New York. The project requires the installation of a new 100,000 BTU natural gas condensing boiler, along with associated components such as unit heaters, expansion tanks, and safety switches. This work must be performed with consideration for the historic nature of the building, adhering to preservation standards. Contractors with experience in boiler installation, particularly in historic settings, and those who can demonstrate technical capability and prior relevant experience are encouraged to bid on this project. The estimated cost for this project is less than $25,000, and it is set aside for small businesses, making it an excellent opportunity for qualified contractors in the HVAC and construction sectors.