WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3
SAM.GOV
Due: June 5, 2025 at 09:00 PM UTC
In-Active Solicitation Source Url

Summary

The WY NP YELL 10(24) project involves the construction and improvement of the Grand Loop Road from Norris to Golden Gate in Yellowstone National Park, specifically Phase 3 of the project. This solicitation is aimed at contractors specializing in highway construction, particularly those with experience in federal projects and environmental considerations due to the sensitive nature of the national park setting. The work will likely include earthwork, alignment adjustments, and possibly the installation of drainage systems, making it essential for bidders to have expertise in these areas. Contractors should be prepared to comply with federal regulations and standards, including those related to environmental protection and safety.
Description

Update 06/09/2025: Offer Summary Posted.

Update 06/04/2025: QA_06-04-2025.pdf posted to attachments.

Update 06/03/2025: QA_06-03-2025.pdf posted to attachments.

Update 05/30/2025: QA_05-30-2025.pdf posted

Entities
TDO
Department of Transportation
FHA
Federal Highway Administration
NAICS
237310
Set Aside
None
Place of Performance
Yellowstone National Park , Wyoming
Point of Contact
Full Name Email Phone Type
Contracts G. Office [email protected] 3606197520 primary
Attachments
  • EPAcompiledSWPPP_NGG3_Pages+209+through+250.pdf
  • yell10-24_XS_SCH+A+Transition_MAIN+848-90+to+851-00.pdf
  • yell10-24_proposed+alignment_Horizontal_WATER.pdf
  • yell10-24_Earthwork_OPT+Z_PED_1999-98+to+2005-80.pdf
  • RFP_69056724R000001_WY+NP+YELL+10%2824%29_FINAL.pdf
  • yell10-24_Earthwork_WATER02.pdf
  • yell10-24_XS_SCH+A+without+OPT+Z_MAIN_851-00+to+859-00.pdf
  • Geometry_Edges+of+Curb+%28EC01-38%29.pdf
  • Geometry_BioswaleCL.pdf
  • EPAcompiledSWPPP_NGG3_Pages+1+through+208.pdf
  • yell10-24_proposed+alignment_Vertical_WATER.pdf
  • Geometry_Grade+Breaks+%28GB01-17%29.pdf
  • EPAcompiledSWPPP_NGG3_Pages+251+through+281.pdf
  • Traverse_Clearing+Limits.pdf
  • yell10-24_1570-001P+Golden+Gate+Bridge+Safety+Inspection+-+2022.pdf
  • yell10-24_Earthwork_SCH+A+without+OPT+Z_MAIN_851-00+to+859-00.pdf
  • QA_05-14-2025.pdf
  • yell10-24_GR+03-24_Pages504-End_OtherAppendices.pdf
  • Superelevation_Entrance+Road.pdf
  • yell10-24_GR+03-24_Pages1-106.pdf
  • yell10-24_1570-001P+-+Golden+Gate+Viaduct+Plans+1977.pdf
  • yell10-24_PED_OPT+Z_VA+Alignment.pdf
  • yell10-24_GR+03-24_Pages107-503_AppxA-E.pdf
  • yell10-24_control-points.xlsx
  • yell10-24_Earthwork_SCH+B_MAIN_822-20+to+851-00.pdf
  • yell10-24_Earthwork_MAIN+SCH+A_Transition.pdf
  • yell10-24_XS_SCH+B_MAIN_820-18.24+to+851-00.pdf
  • yell10-24_XS_OPT+Z_PED_1999-98+TO+2005-80.pdf
  • Physical+Data.zip
  • yell10-24_Project-Name-Change.pdf
  • yell10-24_NGB_X-Sections.pdf
  • yell10-24_Earthwork_SCH+A+w+OPT+Z_MAIN_851-00+to+859-00.pdf
  • yell10-24_PED_OPT+Z_HA+Alignment.pdf
  • EPAcompiledSWPPP_NGG3_Pages+1044+through+1137.pdf
  • yell10-24_XS_SCH+A+w+OPT+Z_MAIN_851-00+to+859-00.pdf
  • yell10-24_XS_SCH+A_WATER.pdf
  • yell10-24_AccessibilityInspectionReport_Form_2-14-19_v508.docx
  • yell10-24_proposed+alignment_Vertical_MAIN.pdf
  • EPAcompiledSWPPP_NGG3_Pages+282+through+1043.pdf
  • yell10-24_MAIN_SCH-A_Transition_VA+Alignment.pdf
  • yell10-24_XS_SCH+A_Golden+Gate.pdf
  • yell10-24_PLAN_%28Set+1+of+2%29.pdf
  • QA_05-01-2025.pdf
  • yell10-24_Superelevation_MAIN.pdf
  • yell10-24_Earthwork_SCH+A_DeepPatch.pdf
  • yell10-24_XS_OPT+Z_GLEN_8000-00+to+8007-00.pdf
  • yell10-24_PLAN_%28Set+2+of+2%29.pdf
  • Geometry_Alignments.pdf
  • yell10-24_Earthwork_WATER01.pdf
  • yell10-24_XS_OPT+Z_OSPREY_1-00+to+10-80.pdf
  • yell10-24_MAIN_SCH-A_Transition_HA+Alignment.pdf
  • yell10-24_proposed+alignment_Horizontal_MAIN.pdf
  • Norris+Geyser+Basin_152.04%28e%29%282%29%28i%29_Controlsheet.xlsx
  • Amendment+A001.pdf
  • QA_05-15-2025.pdf
  • QA_05-19-2025.pdf
  • QA_05-20-2025.pdf
  • Amendment+A002.pdf
  • A002_yell10-24_Phase+2+Erosion+Control.pdf
  • QA_05-21-2025.pdf
  • A003_yell10-24_Earthwork_GOLDENGATE_859+to+889.pdf
  • QA_05-22-2025.pdf
  • Amendment+A003.pdf
  • QA_05-23-2025_1.pdf
  • Amendment+A004.pdf
  • A004_yell10-24_XS_GOLDENGATE_LT+Cut_87767+to+88000.pdf
  • QA_05-27-2025.pdf
  • A004_yell10-24_XS_GOLDENGATE_LT+Cut_86430+to+87425.pdf
  • QA_05-27-2025_2.pdf
  • QA_05-28-2025_2.pdf
  • Amendment+A005.pdf
  • QA_05-28-2025_1.pdf
  • QA_05-29-2025.pdf
  • Amendment+A006.pdf
  • QA_05-30-2025.pdf
  • QA_06-03-2025.pdf
  • QA_06-04-2025.pdf
  • OfferSum_WY+NP+YELL+10%2824%29.pdf