WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3
SAM.GOV
Due: May 30, 2025 at 09:00 PM UTC
In-Active Solicitation Source Url

Summary

The opportunity titled "WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3" involves construction work on a segment of the Grand Loop Road within Yellowstone National Park. This project is part of a larger initiative to enhance and maintain the road infrastructure in this area, which is critical for both park operations and visitor access. The work will likely include earthwork, alignment adjustments, and possibly the installation of drainage systems, as indicated by the various reports and plans associated with the project. Contractors with experience in road construction, particularly those familiar with federal highway projects and environmental regulations, are encouraged to bid. The solicitation is specifically open to a select group of prime contractors, and potential subcontractors are being informed of this opportunity to assist in the bidding process.
Description

Update 05/01/2025: QA_05-01-2025.pdf posted to attachments.

Project: WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

Solicitation No.: 69056724R000001

See attachments for Request for Proposal

Entities
TDO
Department of Transportation
FHA
Federal Highway Administration
NAICS
237310
Set Aside
None
Place of Performance
Yellowstone National Park , Wyoming
Point of Contact
Full Name Email Phone Type
Contracts G. Office [email protected] 3606197520 primary
Attachments
  • EPAcompiledSWPPP_NGG3_Pages+209+through+250.pdf
  • yell10-24_XS_SCH+A+Transition_MAIN+848-90+to+851-00.pdf
  • yell10-24_proposed+alignment_Horizontal_WATER.pdf
  • yell10-24_Earthwork_OPT+Z_PED_1999-98+to+2005-80.pdf
  • RFP_69056724R000001_WY+NP+YELL+10%2824%29_FINAL.pdf
  • yell10-24_Earthwork_WATER02.pdf
  • yell10-24_XS_SCH+A+without+OPT+Z_MAIN_851-00+to+859-00.pdf
  • Geometry_Edges+of+Curb+%28EC01-38%29.pdf
  • Geometry_BioswaleCL.pdf
  • EPAcompiledSWPPP_NGG3_Pages+1+through+208.pdf
  • yell10-24_proposed+alignment_Vertical_WATER.pdf
  • Geometry_Grade+Breaks+%28GB01-17%29.pdf
  • EPAcompiledSWPPP_NGG3_Pages+251+through+281.pdf
  • Traverse_Clearing+Limits.pdf
  • yell10-24_1570-001P+Golden+Gate+Bridge+Safety+Inspection+-+2022.pdf
  • yell10-24_Earthwork_SCH+A+without+OPT+Z_MAIN_851-00+to+859-00.pdf
  • Superelevation_Entrance+Road.pdf
  • yell10-24_GR+03-24_Pages1-106.pdf
  • yell10-24_1570-001P+-+Golden+Gate+Viaduct+Plans+1977.pdf
  • yell10-24_PED_OPT+Z_VA+Alignment.pdf
  • yell10-24_GR+03-24_Pages107-503_AppxA-E.pdf
  • yell10-24_control-points.xlsx
  • yell10-24_Earthwork_SCH+B_MAIN_822-20+to+851-00.pdf
  • yell10-24_Earthwork_MAIN+SCH+A_Transition.pdf
  • yell10-24_XS_SCH+B_MAIN_820-18.24+to+851-00.pdf
  • yell10-24_XS_OPT+Z_PED_1999-98+TO+2005-80.pdf
  • Physical+Data.zip
  • yell10-24_Project-Name-Change.pdf
  • yell10-24_NGB_X-Sections.pdf
  • yell10-24_Earthwork_SCH+A+w+OPT+Z_MAIN_851-00+to+859-00.pdf
  • yell10-24_PED_OPT+Z_HA+Alignment.pdf
  • EPAcompiledSWPPP_NGG3_Pages+1044+through+1137.pdf
  • yell10-24_XS_SCH+A+w+OPT+Z_MAIN_851-00+to+859-00.pdf
  • yell10-24_XS_SCH+A_WATER.pdf
  • yell10-24_AccessibilityInspectionReport_Form_2-14-19_v508.docx
  • EPAcompiledSWPPP_NGG3_Pages+282+through+1043.pdf
  • yell10-24_MAIN_SCH-A_Transition_VA+Alignment.pdf
  • yell10-24_XS_SCH+A_Golden+Gate.pdf
  • yell10-24_PLAN_%28Set+1+of+2%29.pdf
  • QA_05-01-2025.pdf
  • yell10-24_Superelevation_MAIN.pdf
  • yell10-24_Earthwork_SCH+A_DeepPatch.pdf
  • yell10-24_XS_OPT+Z_GLEN_8000-00+to+8007-00.pdf
  • yell10-24_PLAN_%28Set+2+of+2%29.pdf
  • Geometry_Alignments.pdf
  • yell10-24_Earthwork_WATER01.pdf
  • yell10-24_XS_OPT+Z_OSPREY_1-00+to+10-80.pdf
  • yell10-24_MAIN_SCH-A_Transition_HA+Alignment.pdf
  • yell10-24_proposed+alignment_Horizontal_MAIN.pdf
  • Norris+Geyser+Basin_152.04%28e%29%282%29%28i%29_Controlsheet.xlsx