Y1BG--653-25-707 EHRM WAN Path Upgrades Construction - Roseburg VA Medical Center
SAM.GOV
Due: July 1, 2025 at 04:00 PM UTC
In-Active Solicitation SDVOSBC Source Url

Summary

The opportunity Y1BG--653-25-707 involves construction work at the Roseburg VA Medical Center, specifically focusing on the EHRM WAN Path Upgrades. The project aims to enhance the existing infrastructure by providing a redundant fiber network pathway to support the recent Electronic Health Record Modernization. Contractors will be responsible for assessing and verifying existing conditions, trenching, backfilling, and installing conduits and junction boxes, while ensuring the protection of significant tree roots. This project is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), making it an ideal opportunity for qualified contractors in the construction and telecommunications sectors who have experience with similar projects and are familiar with VA regulations and requirements.
Description

Contractor shall assess, inspect, and site verify the existing conditions prior to construction, and provide all labor, materials, equipment, qualified supervision, and other items designated in this contract in accordance with the specifications and drawings to complete Project No. 653-25-707 EH

Entities
VADO
Department of Veterans Affairs
NAICS
236220
Set Aside
SDVOSBC : Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Place of Performance
Roseburg , Oregon 97471
Point of Contact
Full Name Email Phone Type
Sierra Tate [email protected] primary
Richelle N. Gray [email protected] secondary
Attachments
  • Attachment+-+Spec+01+31+00.01+Project+Management+and+Coordination.pdf
  • Wage+Rates+-+Douglas+County+-+5-23-2025.pdf
  • 653-25-707+EHRM+WAN+Path+Upgrade+Drawing+Binder+Reduced+Size.pdf
  • SOW+653-25-107+EHRM+WAN+Path+Upgrade+-+Roseburg+OR+-+Final.pdf
  • 36C77625B0016++5-29-25.docx
  • Attachment+-+Site+Visit+Instructions.pdf
  • 653-25-707+EHRM+WAN+Path+Upgrade+-+Roseburg+OR+SPEC+Book+Final.pdf
  • Attachment+-+Limitations+on+Subcontracting+-+Construction.docx