Y1DA--CON-NRM-663-18-102 Replace Roofs - Seattle VA Phase 2
SAM.GOV
Due: May 19, 2025 at 07:00 PM UTC
In-Active Solicitation Source Url

Summary

The opportunity Y1DA--CON-NRM-663-18-102 involves the replacement of roofs at the Seattle VA Medical Center as part of Phase II of the project. The contractor will be responsible for providing all necessary supervision, labor, materials, and equipment to prepare the project areas for construction operations, which includes selective demolition and removal of existing roofing materials. This project requires contractors with experience in roofing systems, particularly those familiar with working in healthcare environments where operations must continue without interruption. Contractors should be prepared to manage complex logistics and adhere to strict quality control and safety standards, as the work will take place in a busy medical facility.
Description
36C26025R0064 Amendment 0003
Entities
VADO
Department of Veterans Affairs
NAICS
236220
Set Aside
None
Place of Performance
Point of Contact
Full Name Email Phone Type
Stephen E Slaby [email protected] None primary
Attachments
  • 663-18-102+replace+roofs+sign+in+site+visit.pdf
  • S02+WD+WA20250108+03-14-2025.pdf
  • 01+45+00+-+Quality+Control+-+Replace+Roofs+-+Seattle+VA+Ph+II.pdf
  • 36C26025R0064.docx
  • S02+Drawings+Pt2+-+Replace+Roofs+-+Seattle+VA+-+Ph+II.pdf
  • S02+Drawings+Pt1+-+Replace+Roofs+-+Seattle+VA+-+Ph+II.pdf
  • Site+Visit+Map+Replace+Roofs+-+Seattle+VA+Ph+II.pdf
  • 00+01+10+Table+of+Contents_2025+edit.pdf
  • S02+Construction+SOW+663-18-102+Replace+Roofs+-+Seattle+VA+Ph+2.pdf
  • PPQ+663-18-102+Replace+Roofs+-+Seattle+VA.docx
  • Replace+Roofs+-+Seattle+VA+Phase+II++RFI+and+Responses+5-14-2025.docx
  • 663-18-102+Construction+SOW+05.14.2025.docx
  • 36C26025R0064+0002.docx
  • 36C26025R0064+0001.docx
  • S02+Specifications+-+Replace+Roofs+-+Seattle+VA+-+Ph+II.pdf
  • Site+Visit+Map+Replace+Roofs+-+Seattle+VA+Ph+II+5.13.2025.pdf
  • 26+41+00+Facility+Lightning+Protection_2025+edit.pdf
  • 36C26025R0064+0003.docx
  • Seattle+VAMC+Roof+Survey+Report+-+Final+w+Attachments.pdf
  • Replace+Roofs+-+Seattle+VA+Phase+II++RFI+and+Responses+Amend+0003+5-16-2025.docx