Y1DA--FY25: NRM (PROJ: 516-23-117) BB - Refresh Hemodialysis
SAM.GOV
Due: May 20, 2025 at 08:00 PM UTC
In-Active Solicitation Source Url

Summary

The opportunity Y1DA--FY25: NRM (PROJ: 516-23-117) BB - Refresh Hemodialysis involves the renovation and construction work required to refresh the hemodialysis facilities at the C.W. (Bill) Young VA Medical Center in Bay Pines, Florida. This project includes demolition, renovation, and construction activities as outlined in the provided specifications and drawings. Contractors with experience in healthcare facility renovations, particularly those familiar with the specific requirements of VA projects, are encouraged to bid. The work is set to be completed within a specified period of 168 days from the notice to proceed, and the project is set aside for Service-Disabled Veteran Owned Small Businesses (SDVOSB).
Description
Extension of Proposal Due Date to 7 May 2025. RFI answers and revised drawings will be provided in a follow on amendment.
Entities
VADO
Department of Veterans Affairs
NAICS
236220
Set Aside
None
Place of Performance
Point of Contact
Full Name Email Phone Type
Kenneth Caryer [email protected] None primary
Attachments
  • Experience+Information+Sheet.docx
  • 36C24825R0034+0004.docx
  • 516-23-117_VA-BayPines_Hemodialysis_SPECS_REV01_2025.03.26.pdf
  • 516-23-117_VA-BayPines_Hemodialysis_DRAWINGS_REV01_2025.03.26.pdf
  • Attach+8+Past+Performance+Form.pdf
  • Attach+5++EMR.docx
  • 36C24825R0034+0003.docx
  • Attach+7+Instructions+to+Offerors.docx
  • 516-23-117+Scope+of+Work+-+Construction.doc
  • 516-23-117+2025+02+19+Site+Walk+Sign+In.pdf
  • Attach+4+Price+Matrix.xlsx
  • 36C24825R0034+0003.pdf
  • Attach+2+516-23-117+BayPines+Hemodialysis+Bid+set+DRAWINGS+5+Nov+24.pdf
  • RFI+Log+Renovate+Hemodialysis+516-23-117+Final+Answers.docx
  • S02+36C24825R0034.pdf
  • 36C24825R0034+0002.docx
  • Attach+3+Davis+Bacon+Wage+Rate+FL20250222+dated+3+Jan+2025.pdf
  • 36C24825R0034+0001.docx
  • 36C24825R0034_1.docx
  • Attach+1+516-23-117+BayPines+Hemodialysis+Bid+Set+SPECS+8+Nov+24.pdf
  • Attach+6+Limitations+of+Subcontracting.pdf