Y1DZ--523A4-20-208 Replace Boilers and Upgrade Controls
SAM.GOV
Due: June 20, 2025 at 08:00 PM UTC
In-Active Solicitation Source Url

Summary

The opportunity Y1DZ--523A4-20-208 involves the replacement of boilers and the upgrade of controls at the VA Boston Healthcare System's Brockton campus. This project is critical for enhancing the efficiency and reliability of the facility's heating systems, which are essential for maintaining a safe and comfortable environment for patients and staff. Contractors with experience in mechanical systems, particularly those specializing in boiler installation and control systems, are encouraged to bid on this solicitation. The work will require adherence to specific codes and standards, as well as a thorough understanding of the operational needs of healthcare facilities.
Entities
VADO
Department of Veterans Affairs
NAICS
236220
Set Aside
None
Place of Performance
Point of Contact
Full Name Email Phone Type
Alexis C Duda [email protected] None primary
Attachments
  • S02+Base+Offer+Price+Breakdown.xlsx
  • S02+F2-1+Structural+Design+Criteria+523A5-10-316+Laundry+Building+45.pdf
  • S02+F3-1+Code+Search+523A5-10-316+Laundry+Building+45.pdf
  • S02+Attachment+B+Past+Performance+Project+Information+Sheet+for+36C24125R0008.docx
  • S02+F3-3+HLAC+Accreditation+Standards+09.21.2023+523A5-10-316+Laundry+Building+45.pdf
  • S02+Final+Specifications+523A5-10-316+Laundry+Building+45.pdf
  • S02+Final+Drawing+Set+523A5-10-316+Laundry+Building+45+08.21.2024.pdf
  • S02+F8-1+Laundry+Equipment+Storage+523A5-10-316+Laundry+Building+45.pdf
  • 36C24125R0008+0001.docx
  • S02+6500+Appendix+B+and+C+Security+Language+523A-10-316+Laundry+Building+45.pdf
  • S02+Equipment+List+-+Existing+vs+New+Equipment+523A5-10-316+Laundry+Building+45.pdf
  • S02+Primavera+P6+Schedule+Review+Checklist+523A5-10-316+Laundry+Building+45.xlsx
  • S02+SOW+523A5-10-316+Laundry+Building+45.pdf
  • S02+F2-2+Attachment+2+Structural+Calculations+523A5-10-316+Laundry+Building+45.pdf
  • S02+PCRA+523A5-10-316+Laundry+Building+45.pdf
  • S02+Final+Drawings+Revision+01+523A5-10-316+Laundry+Building+45.pdf
  • S02+Submittal+Register+523A5-10-316+Laundry+Building+45.xlsx
  • 36C24125R0008_2.docx
  • S06+Site+Visit+Sign+In+Sheet+4.24.2025.pdf
  • S02+Final+Design+Analysis+Consolidated+523A5-10-316+Laundry+Building+45.pdf
  • S02+Attachment+A+Technical+Project+Information+Sheet+for+36C24125R0008.docx
  • S02+WD+MA20250012+04.04.2025.pdf
  • S02+SSJ+523A-10-316+Laundry+Building+45.pdf
  • S02+Brockton+Campus+Map.pdf