The Y1JZ--NCOTA 3B Completion Project is a presolicitation notice issued by the Department of Veterans Affairs for the National Cemetery of the Alleghenies Phase 3B Development Completion Project. This project aims to enable the cemetery to continue providing burial services for eligible veterans in Washington County, Pennsylvania. The work involves correcting previously identified punch list items as per the plans and specifications prepared by the architect/engineer of record. This opportunity is specifically set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), making it an ideal bidding opportunity for contractors who meet this designation and have experience in commercial and institutional building construction. The estimated project cost ranges between $2,000,000 and $5,000,000, and the work is expected to be completed within approximately 365 calendar days from the notice to proceed.
Description
The Department of Veterans Affairs (VA,) Office of Construction and Facilities Management (CFM,) located at 425 I ST NW Washington, D.C. 20001, is issuing this solicitation for the National Cemetery of the Alleghenies Phase 3B Development Completion Project. This solicitation is 100% set aside for
Entities
VADO
Department of Veterans Affairs
NAICS
236220
Set Aside
None
Place of Performance
Point of Contact
Full Name Email Phone Type
Victoria N Wayne [email protected] None primary
Attachments
  • 36C10F25B0002.docx
  • Appendix+B5+-+Pre-Product+Data.pdf
  • Appendix+D+-+Contract+B-+Caps+to+be+Replaced+Revised.pdf
  • Appendix+B7+-++Fire+Detection+and+alarm+Cable.pdf
  • Appendix+B8+-+Fire+Detection+and+Alarm+Submittal+RE+Response.pdf
  • Appendix+G+-+Electrical+MR+ref+dwg.pdf
  • Appendix+B4+-+Pre-Product+Data.pdf
  • Appendix+N+-+Section+14+Grid+Markers.pdf
  • Appendix+J+-+Sect+C8-C10+Grid+Markers.pdf
  • Appendix+M+-+Section+12+Grid+Markers.pdf
  • Appendix+A+-+FWS+and+Storm+Structures.pdf
  • Appendix+B2+-+Video+Surv.+Product+info.pdf
  • wage+determination++PA20250104.pdf
  • Appendix+I+-+Niche+Touch-up+Locations.pdf
  • Appendix+F+-+Cracked+Mortar-+Columbarium+B.pdf
  • Appendix+B3+-++Video+Surveillance+Cable.pdf
  • Appendix+L+-+Section+11+Grid+Markers.pdf
  • Appendix+O+-+NCOTA+PH3B+Areas+for+Joint+Sealant.pdf
  • Appendix+K+-+Section+9+Grid+Markers.pdf
  • 36C10F25B0002_1.docx
  • Appendix+B1+-++Video+Surv.+Product+info.pdf
  • Appendix+H+-+Cracked+Mortar-+Columbarium+D.pdf
  • Appendix+N1+-++INFILTRATION+BERM.pdf
  • Appendix+S+-+NCOTA+Phase+3B+Development+-+Specifications+Set+1.pdf
  • Appendix+R+-+NCOTA+Phase+3B+Development+-+Package+B+Excerpts.pdf
  • Appendix+A1+-+TEMPORARY+SHELTER+RELOCATION.pdf
  • Appendix+B6+-++MC+Cable.pdf
  • Appendix+D1+-+Columbarium+Niche+Foundation+Finish+and+Vertical+Joints.pdf
  • Appendix+P+-+Sealant+Technical+Data+Sheet.pdf
  • Appendix+E+-+Contract+B-+Sidewalk+Sections+to+Be+Replaced+Revised.pdf
  • Appendix+C+-+Sealant+Replacement+Locations.pdf
  • Appendix+T+-+NCOTA+Phase+3B+Development+-+Specifications+Set+2.pdf
  • Appendix+B+-+Existing+columbarium+concrete+sidewalk+replacement.pdf
  • Appendix+Q+-+NCOTA+Phase+3B+Development+-+Package+A+Excerpts.pdf
  • Sign+in+sheet.pdf
  • S06+-+Pre-Proposal+Conference+slides+NCOTA+3B.pdf
  • 36C10F25B0002+0001.docx
  • 36C10F25B0002+0002.docx
  • 05+52+00-03+SS+Handrail+PD+-+AE+rvw+AN.pdf
  • RFI+Submission+Log+-+7.28.2025+-+final.pdf
  • 36C10F25B0002+0003.docx
  • 05+52+00.4+New+handrail+sections+with+slip+joints.pdf
  • Submittal+05+52+00-1.1+Handrails.pdf
  • 40.1736-C-Infiltration-Letter.pdf
  • 36C10F25B0002+0004.docx
  • 36C10F25B0002+0005.docx
  • RFIs+and+Govt+responses.pdf
  • NCOTA+3B+Temporary+EandS+measures+left+in+place.pdf
  • 04+40+10+01R1+Stone+Caps+Submittal+Revised+RE+Response+20200531.pdf
  • 04+40+10+01R1+Stone+Caps+AE+rvw+AN.pdf
  • 04+40+10+08+Revd+Stone+Caps+at+Ossuary++AE+rvw+NET.pdf