The Y--Alcova-Boysen Thermopolis-Worland Tap OPGW opportunity is a presolicitation for a project managed by the Western Area Power Administration (WAPA) in the Rocky Mountain Region. The project involves the installation of 121 miles of optical overhead ground wire (OPGW) on existing 115-kV transmission lines, which includes the removal of existing steel overhead ground wire, installation of steel angle bedrails, anti-split pole bands, underground fiber optic cable, splice boxes, and associated fiber equipment. Additionally, the contractor will be responsible for installing spiral dampers and performing fiber splicing and testing. This opportunity is set aside for small businesses, making it ideal for contractors with experience in electrical infrastructure, fiber optics, and related installations who can provide the necessary labor, materials, and equipment.
Description
Amendment (0003) - Alcova-Boysen Thermopolis-Worland Tap OPGW - Remove Attch B1. A-B_TH-WRD Tap.pdf file and replace with Attch B4 A-B_TH-WRD Tap.zip file with embedded .kmz file.