Y--Flatiron Substation Breaker Replacement
SAM.GOV
Due: August 1, 2025 at 08:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The Y--Flatiron Substation Breaker Replacement project involves significant substation work, including the demolition and site development, construction of foundations and platforms for electrical equipment, installation of galvanized steel structures, and the installation of government-furnished power circuit breakers. Additionally, contractors will be responsible for furnishing and installing high voltage bus systems, grounding systems, conduits, and insulated cables. This opportunity is particularly suited for small businesses that specialize in electrical infrastructure and substation construction, as it is a total small business set-aside under FAR 19.5.
Description
Flatiron Substation 2025 Breaker Replacement with principal components of substation work to include demolition and site development, foundations and platforms for substation electrical equipment, furnish and install galvanized steel structures, install Government-furnished power circuit breakers, a
Entities
EDO
Department of Energy
NAICS
237130
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Point of Contact
Full Name Email Phone Type
Pratt, John W. [email protected] 720-962-7166 primary