Y--LAKE 254108 Calville Bay Barge Relocation
SAM.GOV
Due: June 30, 2025 at 08:00 PM UTC
In-Active Solicitation Source Url

Summary

The opportunity titled 'Y--LAKE 254108 Calville Bay Barge Relocation' involves the temporary relocation of an existing barge at Callville Bay within the Lake Mead National Recreation Area. The project aims to ensure that the barge is positioned to meet seasonal low lake levels, which includes extending and upsizing electrical lines, replacing an existing transformer, and enhancing access roads. Contractors with experience in marine construction, electrical upgrades, and environmental management are encouraged to bid on this project, particularly those familiar with water intake systems and related infrastructure. The work is significant, with a construction magnitude estimated between $5 million and $10 million, making it suitable for small businesses as well as larger contractors with the necessary capabilities.
Description
LAKE 254108 Calville Bay Barge Relocation
Entities
IDOT
Department of the Interior
NPS
National Park Service
NAICS
237990
Set Aside
None
Place of Performance
Point of Contact
Full Name Email Phone Type
Barber, Mark [email protected] 721-621-7310 primary
Attachments
  • B08_Atch_7_Solit_PSP_Vol_I_PastPerf_REQD.docx
  • Sol_140P2025R0016_Amd_0004.pdf
  • B09_Atch_9_Callville_Bay_Bid_Addendum__1_03-24-25.pdf
  • B09_Atch_2_Construction_Drawings_Final_Rev1_0001.pdf
  • Sol_140P2025R0016.pdf
  • B08_SF_1442_LAKE_254108_Callville_Barge_RV4___Clause_set.pdf
  • B09_Solit_General_Refs_0004.doc
  • B09_Atch_1_Specifications_Final_Rev1_0001.pdf
  • B08_Atch_1_Final_Specifications_V2.pdf
  • Sol_140P2025R0016_Amd_0001.pdf
  • Sol_140P2025R0016_Amd_0003.pdf
  • B08_Atch_6_Solit_PSP_Vol_I_Exp_REQD.docx
  • B09_Site_Visit_Tri_Fold_LAKE_Barge_0003.pdf
  • B08_Atch_3_Clark_County_Wage_Determination_3_14_25.pdf
  • B08_Atch_4_Contract_Price_Schedule.xlsx
  • B09_Site_Visit_Sign_in_Sheet_4_29_205_0003.pdf
  • Sol_140P2025R0016_Amd_0002.pdf
  • B08_Atch_2_Final_Construction_Drawings.pdf
  • B08_Atch_5_Small_Business_Subcontracting_Limitation_Report_DOI_v03.xlsx
  • B09_Atch_1_Specifications_Final_Rev2_0003.pdf
  • B08_Atch_8_Bid_bond_SF24-23a.pdf
  • Sol_140P2025R0016_Amd_0005.pdf
  • B09_Amd_5_LAKE_254108_Q_A_5_27_25_0005.xlsx
  • B09_Contractor_Use_Areas_Clarification_0006.pdf
  • B09_CB_Barge-Existing_0006.pdf
  • Sol_140P2025R0016_Amd_0006.pdf
  • B09_Drawings_09212016_0006.pdf
  • B09_Amd_6_LAKE_254108_Q_A_FINAL_0006.xlsx
  • B09_Amd_7_LAKE_254108_Q_A_FINAL_6_17_25_0007.xlsx
  • Sol_140P2025R0016_Amd_0007.pdf
  • Sol_140P2025R0016_Amd_0008.pdf