Y--WRST 248940 - Deficient Water Treatment System
SAM.GOV
Due: April 23, 2025 at 06:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The opportunity Y--WRST 248940 involves the replacement of a deficient water treatment system at the Glennallen Facility within the Wrangell St. Elias National Park and Preserve in Alaska. This project is a total small business set-aside, inviting bids from small businesses specializing in construction services related to water and sewer line structures. The scope of work includes constructing a new water treatment building, installing a new well, and upgrading existing water processing systems to meet future needs. Contractors with experience in similar construction projects, particularly those involving water treatment facilities, are encouraged to submit proposals. The deadline for proposals is April 23, 2025, and the work is expected to be completed within 365 days of the notice to proceed.
Description
WRST 248940 - Replace Deficient Water Treatment System in Alaska. *Glennallen Facility*
Entities
IDOT
Department of the Interior
NPS
National Park Service
NAICS
237110
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Point of Contact
Full Name Email Phone Type
Hughes, Amber [email protected] 0000000000 primary
Attachments
  • B08_Attachment_1_-_Specifications_WRST_248940_Glennallen_3Mar2025.pdf
  • B08_Attachment_5_-_General_References.doc
  • B08_Attachment_2_-_Drawings_WRST_248940_Glennallen_3Mar2025.pdf
  • Sol_140P2025R0007_Amd_0003.pdf
  • Sol_140P2025R0007_Amd_0002.pdf
  • B09_PreProposal_SiteVisit_SignInSheet_Amd3_0003.pdf
  • B08_Attachment_4_-_LimitOnSubcontractingWorksheet.xlsx
  • B08_Attachment_6_-_Factor_1_PEQ_WRST_248940.docx
  • B08_Attachment_3_-_Wage_Determination_AK20250001_1_31_2025.pdf
  • B09_PreProposal_TriFold_Handout_Amd3_0003.pdf
  • Sol_140P2025R0007.pdf
  • B08_RFP_Body_-_WRST_248940_Total_SB_3_12_2025_Issued.pdf
  • B09_QR_Tracker_-_WRST_248940_Glennallen_Amd2_0002.xlsx
  • B08_Attachment_7_-_PP_Factor_PPQ_WRST_248940.docx
  • Sol_140P2025R0007_Amd_0001.pdf
  • B08_Attachment_8_-_Detailed_Contract_Price_Schedule.xlsx
  • B09_QR_Tracker_-_WRST_248940_Glennallen_Amd3_0003.xlsx