Y--YELL 338221 - Bridge Preservation - 5 Bridges
SAM.GOV
Due: August 19, 2025 at 04:00 PM UTC
In-Active Solicitation SBA Source Url

Summary

The opportunity Y--YELL 338221 involves bridge preservation work on five bridges located in Yellowstone National Park, Wyoming. The National Park Service is seeking proposals from contractors capable of performing this specialized construction work, which includes the Gibbon River Bridge #5, Old Faithful Interchange Bridge, Bridge Bay Bridge, and two optional bridges. The project is expected to be competitive and is open to all interested businesses, particularly those with experience in highway, street, and bridge construction. Contractors should be prepared for challenging conditions, including limited access and environmental restrictions, and must have the capability to manage traffic control during construction while ensuring visitor access to the park.
Description
YELL 338221 - Bridge Preservation - 5 Bridges
Entities
IDOT
Department of the Interior
NPS
National Park Service
NAICS
237310
Set Aside
SBA : Total Small Business Set-Aside (FAR 19.5)
Place of Performance
Point of Contact
Full Name Email Phone Type
Murphy, Shellie [email protected] 7206102690 primary
Attachments
  • B01_Synopsis_PreSolitNotice_2.pdf
  • B08_Attach_1_Specifications.pdf
  • Sol_140P2025R0051_Amd_0001.pdf
  • B08_Attach_6_Past_Performance_Vol_I.docx
  • B08_Attach_5_Project_Experience_Vol_I.docx
  • B08_Attach_4_WD_WY20250038_01_03_2025.pdf
  • Sol_140P2025R0051.pdf
  • B08_Attach_2_Drawings.pdf
  • B08_Attach_8_LmtOnSubconRpt.xlsx
  • B08_Attach_3_PriceSchedule_YELL-338221.xlsx
  • B08_Attach_7_Gen_References_Vol_II.doc
  • B11_Attendance_List_0002.pdf
  • B11_Pre-Proposal_Briefing_Transcripts_0002.pdf
  • B11_Pre-Proposal_Briefing_0002.pdf
  • Sol_140P2025R0051_Amd_0002.pdf
  • B11_Questions_and_Answers_0003.pdf
  • 1570-017P_Bridge_Bay_Bridge_0003.pdf
  • B11_Attachment_1_Specifications_0003.pdf
  • Sol_140P2025R0051_Amd_0003.pdf
  • 1570-060S_Midway_Geyser_0003.pdf
  • B11_Firehole_Pit_Staging_Area_0003.pdf
  • B11_Attachment_2_Drawings_0003.pdf
  • 1570-009P_Gibbon_River_0003.pdf
  • 1570-015P_Firehole_River_3_0003.pdf
  • Sol_140P2025R0051_Amd_0004.pdf
  • B11_Questions_and_Answers_08062025_0005.pdf
  • Sol_140P2025R0051_Amd_0005.pdf
  • Sol_140P2025R0051_Amd_0006.pdf